Maritime inspection · Estonia
Thickness Gauging for Tankers and Cargo Ships at Sillamäe
Sillamäe is a private deep-water port on Estonia's north-east coast, between Tallinn and Narva and close to the Russian border. Its terminals handle shale oil and heavy oil products, chemicals, liquid fertilisers and general cargo, so tankers dominate the traffic. Long liquid-bulk calls give time to measure deck plating, cargo and ballast piping and ballast tanks. When a ship needs gauging here, we bring technicians in from India for that job alone, as Atlantis keeps no staff in Estonia.
Heavy oil and shale oil cargoes
Sillamäe's largest terminal stores and loads shale oil, heavy fuel oil and vacuum gas oil. Heated cargoes of this kind leave their own corrosion pattern in tanks, around heating coils and on deck lines, which is where a tanker gauging scope here begins.
Chemicals and fertilisers
Liquid fertiliser and chemical terminals bring chemical tankers whose coated or stainless tanks and their piping must be checked for corrosion and coating breakdown. Deck and pipe gauging fits comfortably inside the cargo stay at the berth.
Workable winters
The port reports that ships reach its berths without icebreaker help in an average winter, unlike many Gulf of Finland harbours. That makes winter gauging at Sillamäe easier to schedule, though a hard winter can still bring ice to this coast.
Inspection services for ships at Sillamäe
Each service has its own page with the method, the class requirements and what the report contains.
Ultrasonic Thickness Measurement (UTM)
Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.
ExploreSpecial Survey Thickness Measurement
Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.
ExploreCAS (Condition Assessment Scheme)
Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.
ExploreCAP Thickness Measurement
Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.
ExploreESP Gauging
Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.
ExploreHull Structural Integrity
Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.
ExploreShip Piping Inspection
Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.
ExploreScrubber Piping Inspection
EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.
ExploreIHM (Inventory of Hazardous Materials)
IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.
ExploreMarine NDT Services
Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.
ExploreThe Port of Sillamäe and its liquid-bulk trade
Sillamäe lies in Ida-Viru County, on the southern shore of the Gulf of Finland in the far north-east of Estonia, a short distance west of Narva and the border with Russia. The town was built in the Soviet period around an industrial plant and was closed to outsiders for decades. The modern port was developed after independence as a private, landlord-type port, with terminal operators running their own facilities around a deep basin, and a free zone and industrial park behind the quays host dozens of companies. Ships approach directly from the Gulf of Finland, and the berths are deep enough for sizeable tankers and bulk ships as well as the smaller coastal tonnage common on this part of the coast.
Liquid bulk is the main business. The largest terminal, operated today by Puma Energy Baltics, receives shale oil, heavy fuel oil and vacuum gas oil by rail and stores it in a large tank farm before loading tankers. Shale oil is a product of Ida-Viru County's own oil-shale industry, so part of the cargo is genuinely local. Other terminals handle liquid mineral fertilisers and liquid chemicals, and a multipurpose terminal deals with containers, general and bulk cargo, project cargo and ro-ro. The tanker fleet ranges from small product and chemical tankers to larger ships, and most stay alongside for a full loading cycle that can take a day or more.
Much of the port's earlier traffic was transit trade with Russia and Belarus, and the sanctions that followed 2022 cut that sharply, so the terminals now depend more on Estonian cargo and on new business. For gauging, the practical point is that the tankers which call are often on regular loading programmes from the terminal, which gives repeated chances to measure the same ship. The port reports favourable ice conditions, with year-round navigation and no icebreaking needed in an average winter, though in hard winters ice forms along this coast and the Estonian authorities can set restrictions. Summer and autumn are the busiest periods for planned work, but tanker gauging here is not tied to the season the way it is at the ice-bound Bothnian ports.
Gauging sites at the Sillamäe terminals
Tankers at the oil-product berths are gauged under the terminal's and the ship's permit systems. During loading, the team measures deck plating, the outside of cargo, ballast, heating and vent lines, and the ballast tanks the crew has certified safe. Heated cargoes such as heavy fuel oil and shale oil create condensation and corrosion around heating coils and along tank bottoms, so cargo-tank internals and coils are measured when the tanks are cleaned and gas-free, either at the end of a period on the trade or at the yard. Chemical tankers at the fertiliser and chemical terminals follow the same split between work during cargo operations and work after cleaning.
General cargo and bulk ships at the multipurpose terminal are gauged hold by hold as the cargo allows. We do not plan dockings at Sillamäe; ships calling here dock at Tallinn Shipyard on the Kopli peninsula, at yards in Finland or further afield, and gauging during a Sillamäe loading can give that yard a steel list in advance. Ships waiting at anchor off the port for a berth can be reached by launch through the agent if the weather and the terminal programme allow.
- Oil-product terminal berths — tankers loading shale oil, heavy fuel oil and vacuum gas oil; deck, piping and ballast-tank gauging during loading
- Liquid fertiliser terminal — chemical tankers; deck, pipework and ballast spaces measured inside the terminal's safety regime
- Liquid chemicals terminal — chemical tankers with coated or stainless tanks; external piping and deck gauging, tank internals when gas-free
- Multipurpose cargo terminal — general cargo, bulk, project and ro-ro ships; hold and tank gauging during cargo operations
- Anchorage off Sillamäe — ships waiting for a berth; launch access through the agent in suitable weather
Thickness measurement through the survey cycle at Sillamäe
Class rules set the survey cycle, and the cycle sets how much gauging a ship needs. A superintendent planning a call at Sillamäe usually knows which survey is due; the table shows what the thickness measurement for each one typically involves. The exact extent comes from the class rules for the ship type and the surveyor attending, so the thickness measurement programme is agreed with the class before work starts.
| Survey | When it falls | What the thickness measurement usually covers |
|---|---|---|
| Annual survey | Every year, within three months of the anniversary date | General examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey. |
| Intermediate survey | In place of the second or third annual survey | Suspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age. |
| Renewal survey No. 1 | Around 5 years | The first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal. |
| Renewal survey No. 2 | Around 10 years | Wider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey. |
| Renewal survey No. 3 | Around 15 years | Extensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal. |
| Renewal survey No. 4 and later | Around 20 and 25 years | Gauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme. |
| Docking survey | Twice in each five-year period | Bottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged. |
Inspection, scrutiny and the tanker trade from Sillamäe
Port state control at Sillamäe is the responsibility of the Estonian Transport Administration under the Paris MoU. Tankers and chemical tankers are among the higher-risk ship types in the regime's targeting, and since 2022 the Gulf of Finland has seen tighter scrutiny of tankers, as the Baltic states pay closer attention to the condition, documentation and insurance of older tankers trading in the region. A tanker loading at Sillamäe is therefore better placed with a recent, well-documented condition record, including the gauging behind its last survey. Charterers and terminal operators also vet ships before accepting them, and heavy wastage on deck lines is a common reason for a poor vetting.
The cargoes themselves set the gauging priorities. Heavy fuel oil and shale oil are carried heated, and repeated heating and cooling, together with water settling out of the cargo, drive corrosion on tank bottoms, coil supports and lower stiffeners. Liquid fertilisers and some chemicals are aggressive to steel wherever coatings fail. Ships that trade into Sillamäe from outside the EU carry an Inventory of Hazardous Materials under the EU Ship Recycling Regulation, and tankers sailing between EU ports have their emissions counted under the EU ETS and FuelEU Maritime.
Ships trading to Sillamäe are inside a sulphur emission control area, where fuel must not exceed 0.10% sulphur unless an exhaust gas cleaning system (scrubber) is fitted. Scrubber wash-water piping, the overboard discharge and the hull penetration around it are among the fastest-corroding parts of a modern ship, so they belong in the gauging scope at every docking and, on open-loop systems, between dockings.
Typical gauging jobs at Sillamäe
Most Sillamäe work is tanker work during loading: deck, piping and ballast-tank gauging for vetting, intermediate surveys and owner's condition checks, with cargo tank internals planned for gas-free periods. Chemical tankers at the fertiliser and chemical terminals bring smaller scopes on deck and pipework, and the multipurpose terminal brings hold gauging on general cargo and bulk ships. Pre-purchase gauging arises when tankers on the trade change hands, and pre-docking gauging gives Tallinn Shipyard or another yard a steel estimate before a docking. Each job is agreed with the terminal as well as the ship, because terminal permits govern any work on deck during cargo operations.
- Deck plating and cargo, ballast and heating-line gauging on a product tanker loading heavy fuel oil, ahead of a charterer's vetting
- Ballast-tank gauging with pitting records on a chemical tanker at the liquid fertiliser terminal
- Measurement of heating coils, tank bottoms and lower stiffeners on a shale-oil tanker during a gas-free period
- Hold and hatch coaming gauging on a general cargo ship at the multipurpose terminal
- Pre-docking steel estimate on a tanker loading at Sillamäe before her docking at Kopli
How a thickness measurement job runs at Sillamäe
Most of the work on a Sillamäe job happens before the team boards: scope, plan and access are settled first, so the time on board goes on measurement.
The team flies into Tallinn Airport and drives east through Ida-Viru County to Sillamäe. Estonia is a Schengen state, so our technicians from India travel on Schengen visas, applied for as early as the loading date allows. The ship's agent arranges port access with the port and the terminal operator concerned, and the tanker and chemical terminals require their own safety induction before anyone goes on deck. Where a second ship is due at Muuga or Tallinn in the same week, both jobs can share one trip.
- Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
- We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
- Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
- Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
- Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
- The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.
Who does the work, and when class approval applies
The inspection team is mobilised from India for each job; nobody is stationed at the port, so mobilisation is planned against the vessel's schedule and visa lead times. Our founder and Responsible NDT Level III, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has over eleven years of international field experience, plans and supervises the work. Technicians are certified under the company's written practice to ASNT SNT-TC-1A, and the company holds ISO 9001 and ISO 14001 certification.
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Governing codes and standards
- IACS UR Z7 hull classification surveys
- IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
- IACS UR Z17 approval of service suppliers
- SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
- MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
- The rules of the vessel's classification society
What you receive
- Thickness measurement report on the class formats, with sketches
- Summary of substantial and excessive corrosion against allowable margins
- Pitting and grooving records with depth and extent
- Piping wall-thickness tables with isometric sketches
- Magnetic particle or penetrant crack-detection reports
- Gauge calibration records and technician certificates
Industries served
- Product tankers
- Heavy-oil and shale-oil tankers
- Chemical tankers
- General cargo and project cargo ships
- Bulk carriers
- Ro-ro cargo ships
- Tugs and harbour craft
Frequently asked questions
Can you gauge a tanker's deck and piping during loading at Sillamäe?
Yes, within the terminal's and the ship's permits. Deck plating, the outside of cargo, ballast, heating and vent lines, and ballast tanks certified safe by the crew can be measured while loading continues. Work near the manifolds and during critical operations is scheduled with the chief officer. Cargo tank internals need gas-free certification and are planned separately, at the end of a period on the trade or at the yard.
Why does heated cargo cause extra corrosion?
Heavy fuel oil and shale oil are carried warm, and the cycle of heating and cooling, together with water settling out of the cargo, attacks tank bottoms, the supports of heating coils and lower stiffeners. The coils themselves thin and leak. We measure those areas closely when tanks are clean and gas-free, and record pitting depths, because isolated deep pits on a tank bottom matter more than the average reading.
Is winter a problem for gauging at Sillamäe?
Usually not. The port reports that in an average winter ships reach it without icebreaker assistance, so winter calls are more predictable than at many Gulf of Finland harbours. In a hard winter ice can still form along the coast. Inside the ship, cold mainly affects how long spaces take to ventilate and the couplant we choose.
Where would a ship from Sillamäe go for docking?
Tallinn Shipyard on the Kopli peninsula, west along the coast, is the obvious Estonian choice, and owners also use yards in Finland, Poland and further afield. We can gauge the ship during a Sillamäe loading so the chosen yard has a steel estimate in advance, and then follow her to the dock to verify the bottom and shell and complete the scope once tanks are gas-free.
Does thickness measurement at Sillamäe need class approval?
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Planning a survey or a drydock?
Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Request a QuoteRequest a ship gauging quote
Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Speak to an ASNT NDT Level III
Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.