Maritime inspection · Qatar

Thickness Measurement for LNG Carriers and Gas Ships at Ras Laffan

Ras Laffan, on Qatar's north-east coast, is one of the largest LNG export ports in the world, and the Erhama Bin Jaber Al Jalahma Shipyard inside the port docks gas carriers, tankers and other large ships. For superintendents running LNG, LPG and condensate ships, we provide thickness measurement at Ras Laffan for renewal and docking surveys, pre-docking steel estimates and condition records. Technicians travel from India, and their passes for the port's strict entry controls are arranged before they fly.

TM plans sized for Q-Max hulls

The largest ships in the Qatari LNG fleet carry very large ballast tank areas and long trunk decks. A compartment-by-compartment plan agreed before docking keeps the reading count manageable without missing the areas class requires.

Docking periods at the port yard

Gas carriers trading from Ras Laffan can dock at the shipyard inside the port without a long positioning voyage. That is where full renewal-survey gauging and post-repair confirmation readings are done.

Steam plants and big seawater systems

Steam-turbine LNG carriers run large main condenser seawater circuits. Warm Gulf intake water speeds internal wastage in those lines, sea chests and the fire main, so piping deserves a place in the plan.

Inspection services for ships at Ras Laffan

Each service has its own page with the method, the class requirements and what the report contains.

Ultrasonic Thickness Measurement (UTM)

Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.

Explore

Special Survey Thickness Measurement

Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.

Explore

CAS (Condition Assessment Scheme)

Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.

Explore

CAP Thickness Measurement

Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.

Explore

ESP Gauging

Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.

Explore

Hull Structural Integrity

Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.

Explore

Ship Piping Inspection

Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.

Explore

Scrubber Piping Inspection

EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.

Explore

IHM (Inventory of Hazardous Materials)

IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.

Explore

Marine NDT Services

Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.

Explore

Ras Laffan: Qatar's LNG export port and its gas fleet

Ras Laffan Industrial City, on the north-east coast of the Qatar peninsula, is built around the liquefaction trains that process gas from the offshore North Field. Its port loads LNG for buyers in Asia, Europe and beyond, alongside LPG, condensate, refined products and the gas-to-liquids products of the Pearl and Oryx GTL plants. The fleet that calls is specialised and valuable: membrane and Moss-type LNG carriers, including the large Q-Flex and Q-Max designs developed for the Qatari trade, plus LPG carriers, condensate tankers and product tankers.

LNG carriers turn round quickly at the loading berths, so the port stay itself rarely allows gauging beyond a few accessible spaces. Time comes at the shipyard. The Erhama Bin Jaber Al Jalahma Shipyard, inside the port limits, was built to take the largest LNG carriers in the Qatari fleet and handles repair, docking and survey work for gas carriers, tankers and offshore units. Its location means ships trading from Ras Laffan can dock without a long ballast passage to a distant yard. Ships also wait at the Ras Laffan anchorage for loading slots, which can open short windows for deck and ballast-tank work on LPG carriers and tankers.

Gauging demand at Ras Laffan is therefore centred on docking periods. LNG carriers are surveyed against IACS UR Z7, the general hull survey requirement, together with the class society's gas-carrier rules, rather than the ESP regime, so the gauging extent differs from a crude tanker's. The cargo containment itself is not the target; the work is on the hull envelope, the inner hull measured from within the ballast tanks, double-bottom and wing ballast tanks, cofferdams, trunk deck and weather deck, and the ship's seawater, ballast and fire-main piping. Older steam-turbine LNG carriers coming to the end of long charters add pre-sale and pre-conversion gauging to the mix, where a buyer wants measured margins rather than the seller's maintenance history.

Where LNG carrier hull gauging is done at Ras Laffan

Most full programmes take place at the Erhama Bin Jaber Al Jalahma Shipyard, where ships are in dry dock or at repair berths with staging and gas-free certificates in place. The yard's sequence drives the work: ballast tanks are opened, cleaned and ventilated in groups, so we take readings tank by tank as they are released and pass suspect results to the superintendent each day. On membrane ships, readings on the inner hull are taken from the ballast side only, and nothing is done inside the cargo containment system.

Outside the yard, opportunities are limited but real. LPG carriers, condensate tankers and product tankers sometimes have idle periods at anchorage or lay-by, when deck plating, accessible ballast tanks and piping can be measured. Port service craft, the tugs, mooring launches and pilot boats that work the LNG berths, also need gauging at their renewal surveys. Because every visit to the industrial city depends on security passes, we try to group these smaller scopes with a docking already planned at the yard, so the permits and travel serve more than one vessel.

  • Erhama Bin Jaber Al Jalahma Shipyard — renewal and docking-survey gauging on LNG carriers, LPG carriers and tankers in dry dock, with confirmation readings after steel renewal
  • Shipyard repair berths — afloat gauging of ballast tanks, cofferdams and piping on gas carriers before the ship enters dock or after it floats out
  • Ras Laffan anchorage — deck, ballast tank and piping checks on LPG carriers and product tankers waiting for loading slots, by launch through the agent
  • Condensate and product berths — limited pipe and deck gauging on tankers lying idle at the berth, subject to the terminal's own permit
  • Port service craft berths — renewal-survey gauging of the tugs, mooring launches and pilot boats that handle the LNG fleet

Thickness measurement through the survey cycle at Ras Laffan

Class rules set the survey cycle, and the cycle sets how much gauging a ship needs. A superintendent planning a call at Ras Laffan usually knows which survey is due; the table shows what the thickness measurement for each one typically involves. The exact extent comes from the class rules for the ship type and the surveyor attending, so the thickness measurement programme is agreed with the class before work starts.

SurveyWhen it fallsWhat the thickness measurement usually covers
Annual surveyEvery year, within three months of the anniversary dateGeneral examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey.
Intermediate surveyIn place of the second or third annual surveySuspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age.
Renewal survey No. 1Around 5 yearsThe first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal.
Renewal survey No. 2Around 10 yearsWider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey.
Renewal survey No. 3Around 15 yearsExtensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal.
Renewal survey No. 4 and laterAround 20 and 25 yearsGauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme.
Docking surveyTwice in each five-year periodBottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged.

Gas-carrier rules, port state control and the LNG expansion

Ras Laffan is a Qatari port and so is covered by the Riyadh MoU port state control regime, though the LNG fleet calling here also faces demanding charterer and terminal vetting. Gas carriers are inspected under OCIMF's SIRE programme like oil and chemical tankers, and terminal acceptance depends on a clean record. No emission control area applies in Qatari waters. LNG carriers burn boil-off gas for much of their propulsion, so scrubber piping is rarely the issue here, but large seawater systems are, particularly on steam-turbine ships with big main condenser circuits drawing warm Gulf water.

QatarEnergy's North Field expansion is adding liquefaction capacity at Ras Laffan and has brought a large new fleet of LNG carriers into service, with more to follow. For new ships, an owner-specified baseline of readings at an early docking gives every later survey a reference. At the other end of the age range, steam-turbine LNG carriers built for the early Qatari contracts are reaching the point where owners choose between further trading, conversion to floating storage or regasification units, or sale, and each option calls for a clear picture of the hull's remaining margins. Warm, saline ballast water and high deck temperatures work against the coatings in wing and double-bottom tanks on all of them.

Wherever a ship is outside a sulphur emission control area, the global 0.50% sulphur cap applies, and many of the ships calling at Ras Laffan meet it with an exhaust gas cleaning system rather than compliant fuel. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service, especially on open-loop systems, and are worth adding to the gauging scope.

Typical gauging jobs at Ras Laffan

Ras Laffan work almost always follows a docking or a commercial decision about a gas carrier. The scopes below show the usual pattern. Each is planned from the class survey status, the previous gauging records and the yard's work sequence, and gauging is coordinated with the superintendent so suspect areas reach the repair list before the dock period runs out.

  • Renewal-survey gauging of a membrane LNG carrier at the Erhama yard: wing and double-bottom ballast tanks, the ballast-side face of the inner hull, cofferdams, trunk deck and side shell.
  • Ballast tank gauging on LNG carriers ahead of docking, carried out at the yard's repair berth so the owner can firm up steel renewal before the dock date.
  • Main condenser seawater circulating lines, sea chests and fire main gauging on a steam-turbine LNG carrier, where warm Gulf intake water speeds up internal wastage.
  • Pre-sale condition gauging of an older Moss-type LNG carrier offered for conversion to floating storage, giving the buyer a measured record of the hull.
  • LPG carrier thickness measurement during a docking: ballast tanks, hold spaces around the cargo tanks, deck and piping, scoped to the class renewal survey.

How a thickness measurement job runs at Ras Laffan

Most of the work on a Ras Laffan job happens before the team boards: scope, plan and access are settled first, so the time on board goes on measurement.

Hamad International Airport (DOH) is the arrival point, served directly from many Indian cities, and from there the team drives north to Ras Laffan Industrial City. Entry to the industrial city and the port is tightly controlled: every person needs a security pass applied for in advance, sponsored through the yard or the ship's agent, and the portable gauging equipment may also need to be declared. Entry formalities for Qatar are handled ahead of travel, which is why we want the docking date as early as possible and start the pass applications alongside them.

  • Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
  • We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
  • Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
  • Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
  • Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
  • The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.

Who does the work, and when class approval applies

The inspection team is mobilised from India for each job; nobody is stationed at the port, so mobilisation is planned against the vessel's schedule and visa lead times. Our founder and Responsible NDT Level III, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has over eleven years of international field experience, plans and supervises the work. Technicians are certified under the company's written practice to ASNT SNT-TC-1A, and the company holds ISO 9001 and ISO 14001 certification.

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Governing codes and standards

  • IACS UR Z7 hull classification surveys
  • IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
  • IACS UR Z17 approval of service suppliers
  • SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
  • MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
  • The rules of the vessel's classification society

What you receive

  • Thickness measurement report on the class formats, with sketches
  • Summary of substantial and excessive corrosion against allowable margins
  • Pitting and grooving records with depth and extent
  • Piping wall-thickness tables with isometric sketches
  • Magnetic particle or penetrant crack-detection reports
  • Gauge calibration records and technician certificates

Industries served

  • LNG carriers (membrane and Moss-type)
  • LPG carriers
  • Condensate and product tankers
  • Tugs and port service craft
  • Offshore support vessels

Frequently asked questions

Do you gauge inside the cargo tanks of membrane LNG carriers?

No. Membrane containment systems are inspected by specialists under the containment designer's and the class society's procedures, and they are not part of an ultrasonic hull gauging scope. Our work covers the hull structure around them: the inner hull as reached from the ballast tanks, the ballast tanks themselves, cofferdams, trunk deck, weather deck and shell plating, plus the ship's piping systems.

How does gas carrier thickness gauging differ from tanker gauging?

Gas carriers are not covered by the ESP Code, so the extent of measurement comes from IACS UR Z7 plus the gas-carrier rules of the ship's classification society, not the UR Z10 series. In practice the focus shifts to ballast tanks, cofferdams and the hull envelope around the cargo tanks, with fewer readings in cargo spaces. The ship's age and the renewal survey number still drive the extent.

What permits are needed for ultrasonic thickness measurement at Ras Laffan?

Each technician needs a Ras Laffan security pass, and the portable equipment being brought in may also have to be registered. Inside the yard, tank entry follows the yard's permit-to-work and gas-free certification system. Because pass approvals take time, we ask for the docking date, the yard contact and the agent's details as soon as the docking is booked.

Is gauging useful on a new LNG carrier that has only just entered service?

It can be. A newbuild has no history, and a measured baseline of key areas, such as ballast tank plating and stiffeners, deck, bottom and side shell, at an early docking gives later surveys a reference against original thicknesses. For owners of large new fleets, consistent baseline data across sister ships also makes it easier to spot a ship or a tank that is wearing faster than the rest.

Does thickness measurement at Ras Laffan need class approval?

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Planning a survey or a drydock?

Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.

Request a Quote

Request a ship gauging quote

Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.








Speak to an ASNT NDT Level III

Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.