Maritime inspection · Saudi Arabia

Ultrasonic Thickness Measurement and Hull Gauging in Dammam

King Abdulaziz Port in Dammam is the main commercial gateway on Saudi Arabia's Gulf coast, and the Aramco loading terminals further up the coast keep crude and gas tankers working the same waters. A superintendent with a ship here usually needs gauging fitted around a short cargo call, a wait at anchorage or a yard booking across the water in Bahrain. We mobilise a team to Dammam from India, measure hull structure, tanks and piping to your scope, and plan the work around the berth window you actually have.

Gauging inside short cargo windows

Container and general cargo calls at King Abdulaziz Port leave little idle time, so we agree a selective scope in advance, such as deck, hatch coamings, scrubber overboard lines or a single tank, and work it alongside cargo operations.

Weighted for Gulf corrosion

Ships trading permanently in the Eastern Province see faster ballast tank coating breakdown, wasted sea-water and fire-main piping and condensation damage in voids. We target those areas first rather than spreading readings evenly across the hull.

Linked to Bahrain and UAE yards

Much Eastern Province tonnage docks at ASRY in Bahrain or at yards in the UAE. Gauging done in Dammam before the ship sails gives the repair yard a measured steel renewal estimate before the vessel arrives.

Inspection services for ships at Dammam

Each service has its own page with the method, the class requirements and what the report contains.

Ultrasonic Thickness Measurement (UTM)

Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.

Explore

Special Survey Thickness Measurement

Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.

Explore

CAS (Condition Assessment Scheme)

Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.

Explore

CAP Thickness Measurement

Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.

Explore

ESP Gauging

Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.

Explore

Hull Structural Integrity

Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.

Explore

Ship Piping Inspection

Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.

Explore

Scrubber Piping Inspection

EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.

Explore

IHM (Inventory of Hazardous Materials)

IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.

Explore

Marine NDT Services

Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.

Explore

King Abdulaziz Port and Shipping in Dammam

King Abdulaziz Port Dammam, run by the Saudi Ports Authority (Mawani), is the main commercial port on the Kingdom's Gulf coast and serves Dammam, Al Khobar, Dhahran and the wider Eastern Province. Container traffic, mainline and feeder, makes up much of the activity, with Saudi Global Ports operating terminals in the port. Around the container berths sit general cargo, project cargo, ro-ro and dry bulk berths handling the imports that the region's industry, construction and households depend on. Offshore support vessels, tugs and workboats serving the offshore oil and gas fields also use the port, and the Zamil yard inside it builds and repairs that class of vessel.

How long a ship stays decides what can be gauged. A container ship on a liner schedule may be alongside for little more than its cargo exchange, so work on it is selective and agreed with the master and terminal beforehand. Bulk and general cargo ships discharging into the Eastern Province usually stay longer, and holds become accessible one by one as they are emptied and swept. Ships waiting for a berth lie at the anchorage off the port, which suits pre-purchase and condition gauging reached by launch. North of Dammam, tankers loading at Ras Tanura and Ju'aymah rarely have time for gauging during the loading call itself; that work is better done at anchorage before or after loading, with the operator's agreement, or at a yard.

What sets Dammam apart is how hard the environment works on steel. Summer air temperatures, warm and saline Gulf water and humid nights speed up coating breakdown in ballast tanks, drive condensation in voids, duct keels and cofferdams, and attack sea-water cooling lines, fire mains and air pipes. Ocean-going ships pass through; the feeder, offshore and regional tanker fleets that work from here live in these conditions all year. That creates steady demand for repeat condition gauging between surveys, not only at five-yearly renewals, and for pre-docking gauging before a yard visit across the Gulf of Bahrain or down the coast to the UAE.

Where Gauging Happens in and Around Dammam

Most jobs in Dammam are done afloat: alongside at King Abdulaziz Port during cargo operations, or at the outer anchorage while a ship waits for its berth. Afloat work suits deck plating, hatch coamings, exposed piping and any tank the master can have cleaned, ventilated and certified gas-free. For offshore support vessels, tugs and workboats, the Zamil shipbuilding and repair yard inside the port gives full access in dock, including bottom plating, sea chests and the tanks that are hard to reach afloat.

Deep-sea ships from the Eastern Province generally dock elsewhere. ASRY in Bahrain is the established large repair yard closest to Dammam, and the UAE yards take a share of the work. When a ship is heading to one of them, gauging it in Dammam first lets the superintendent send measured wastage, not estimates, with the repair specification, and the yard can order steel before the ship arrives. Outdoor work in the Saudi summer is restricted in the middle of the day, so we schedule deck and shell readings for the early morning and late afternoon and use the hottest hours for work inside tanks.

  • King Abdulaziz Port container terminals — selective gauging of deck, hatch coamings and scrubber overboard piping within the cargo window of a scheduled call
  • King Abdulaziz Port general cargo and bulk berths — hold, tank top and hopper gauging as each hold is discharged and swept
  • Zamil shipbuilding and repair yard, King Abdulaziz Port — in-dock hull, tank and sea-chest gauging on offshore support vessels, tugs and workboats
  • Dammam anchorage — pre-purchase, on-hire and condition gauging on ships waiting for a berth, reached by launch through the ship's agent
  • Ras Tanura and Ju'aymah — tanker gauging at anchorage before or after loading, where the terminal operator and the ship's operator agree to it
  • ASRY, Bahrain — pre-docking estimates and in-dock gauging for Eastern Province ships that dock across the water

Thickness measurement through the survey cycle at Dammam

Every renewal survey asks for more thickness measurement than the last, and for oil tankers, chemical tankers and bulk carriers the ESP Code adds close-up survey on top. The table is the usual shape of the work; the class rules and the surveyor set the exact extent, which is why the measurement plan for a job at Dammam is agreed in writing before mobilisation.

SurveyWhen it fallsWhat the thickness measurement usually covers
Annual surveyEvery year, within three months of the anniversary dateGeneral examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey.
Intermediate surveyIn place of the second or third annual surveySuspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age.
Renewal survey No. 1Around 5 yearsThe first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal.
Renewal survey No. 2Around 10 yearsWider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey.
Renewal survey No. 3Around 15 yearsExtensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal.
Renewal survey No. 4 and laterAround 20 and 25 yearsGauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme.
Docking surveyTwice in each five-year periodBottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged.

Port State Control, Sulphur Rules and the Eastern Province Fleet

Saudi Arabia belongs to the Riyadh MoU, the port state control regime of the GCC states, so ships calling at Dammam are inspected under that regime. Structural wastage, holed air pipes, corroded ventilators and leaking fire-main sections are the kind of finding that a short gauging and inspection visit before arrival can catch while there is still time to repair. The Gulf is not an emission control area: the global sulphur limit of 0.50% under MARPOL Annex VI regulation 14, in force since 1 January 2020, is the rule here, and ships with exhaust gas scrubbers can burn high-sulphur fuel. Wash water is acidic and warm, and in Gulf service the overboard pipes, distance pieces and valve bodies downstream of the scrubber are where thinning shows first.

The fleet that calls repeatedly at Dammam is regional: Saudi and Gulf-owned feeder and general cargo ships, offshore support vessels on charter to the oil and gas fields, and tankers lifting from the Aramco terminals up the coast. Long-term charters with energy companies usually carry condition clauses, and tanker charterers and oil-major vetting look closely at structure on ships approaching their third renewal survey. For these owners, thickness gauging in Saudi Arabia is part of keeping a charter as much as passing a survey, which is why trend data from one visit to the next matters.

Wherever a ship is outside a sulphur emission control area, the global 0.50% sulphur cap applies, and many of the ships calling at Dammam meet it with an exhaust gas cleaning system rather than compliant fuel. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service, especially on open-loop systems, and are worth adding to the gauging scope.

Typical thickness gauging jobs in Dammam

Gauging and ship inspection in Dammam tend to be short, targeted visits rather than full-ship campaigns, because most of the fleet here is either working cargo or about to sail for a yard. The scope is set by what the berth or anchorage time allows and by the decision the owner has to make next: what steel to order, whether to buy the ship, or what to show a charterer.

  • A feeder container ship alongside King Abdulaziz Port: scrubber overboard piping and sea-water cooling lines gauged during a single cargo call, with findings discussed with the chief engineer before departure
  • A geared bulk carrier discharging into the Eastern Province: hold frames, hopper plating and tank top gauged as each hold is emptied, ahead of its third renewal survey
  • An offshore support vessel docked at the Zamil yard: bottom plating, sea chests and double-bottom tanks gauged in dock to scope steel renewal before the work package closes
  • A product tanker at the Dammam anchorage: pre-purchase gauging of deck, cargo tank deckheads and ballast tanks for a buyer's technical team
  • An LPG carrier due at ASRY: pre-docking gauging of ballast tanks and hull structure in Dammam, so the yard receives a steel estimate before the ship crosses to Bahrain

How a thickness measurement job runs at Dammam

A gauging job at Dammam runs the same way whatever the ship type. The sequence below is what the superintendent, the attending surveyor and the yard can expect from us.

Our team flies into King Fahd International Airport, which has direct services from several Indian cities, and travels by road to Dammam or to the landing point for the anchorage. Access to King Abdulaziz Port needs ISPS gate passes, which the ship's agent applies for with each technician's passport and visa details; anchorage work needs a launch, also booked through the agent. Indian technicians need a Saudi business visit visa, so we start the application as soon as the vessel's dates are firm and keep the agent informed. For a planned yard visit, that lead time sits comfortably inside normal drydock planning.

  • Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
  • We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
  • Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
  • Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
  • Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
  • The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.

Who does the work, and when class approval applies

Atlantis mobilises its inspection team from India to the vessel, for each job. There is no office or agent at the port; the team travels to the ship, which is why the planning step comes first. Work is planned and supervised by our Responsible NDT Level III, the founder, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has more than eleven years of international field experience. Technicians are qualified and certified under the company's written practice to ASNT SNT-TC-1A, and Atlantis is certified to ISO 9001 and ISO 14001.

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Governing codes and standards

  • IACS UR Z7 hull classification surveys
  • IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
  • IACS UR Z17 approval of service suppliers
  • SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
  • MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
  • The rules of the vessel's classification society

What you receive

  • Thickness measurement report on the class formats, with sketches
  • Summary of substantial and excessive corrosion against allowable margins
  • Pitting and grooving records with depth and extent
  • Piping wall-thickness tables with isometric sketches
  • Magnetic particle or penetrant crack-detection reports
  • Gauge calibration records and technician certificates

Industries served

  • Container ships
  • General cargo and multipurpose ships
  • Bulk carriers
  • Crude and product tankers
  • LPG carriers
  • Offshore support vessels
  • Tugs and workboats
  • Ro-ro vessels

Frequently asked questions

Can you gauge a container ship during a short call at King Abdulaziz Port?

Yes, if the scope is matched to the window. A liner call leaves time for selective work, such as upper deck, hatch coamings, accessible ballast or fuel tank boundaries and scrubber overboard lines, but not for the full gauging a renewal survey needs. Send us the call schedule and the areas of concern, and we plan readings so the team is off the ship before cargo work ends. Larger scopes are better done at anchorage or in dock.

Which areas corrode fastest on ships trading permanently in the Eastern Province?

On ships that stay in the Gulf, the heaviest wastage usually turns up in ballast tanks with failed coatings, especially those next to heated fuel tanks or engine-room bulkheads, in sea-water cooling and fire-main piping, in air pipes and ventilators on deck, and in voids where condensation collects overnight. A gauging plan for a Gulf-based ship should weight those areas, rather than copying the pattern used for an ocean-going ship.

Do you work at Ras Tanura and the other terminals, or only in Dammam port?

Our team goes to wherever the vessel is and the authorities allow access. Aramco terminals such as Ras Tanura run strict access and safety rules, and a tanker's loading time is rarely the moment for gauging. We normally work tankers from this area at anchorage before or after loading, at a yard, or at the next port that gives a longer stay, all arranged through the ship's agent.

How much notice do you need for UTM services in Dammam?

For UTM services in Dammam, the Saudi business visit visa has to be issued and the port passes approved before the team flies. Visa processing is the longest step, so the earlier you confirm the job, the more flexible we can be. For a drydock in Bahrain or the UAE booked months ahead, that is rarely a problem; for a short-notice call, tell us the vessel's dates as soon as they are firm.

Does thickness measurement at Dammam need class approval?

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Planning a survey or a drydock?

Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.

Request a Quote

Request a ship gauging quote

Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.








Speak to an ASNT NDT Level III

Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.