Maritime inspection · Saudi Arabia
Thickness Gauging for Chemical Tankers, Gas Carriers and Bulk Ships in Jubail
Jubail's ports exist to ship what Jubail Industrial City makes. Chemical and product tankers, gas carriers and bulk carriers lift petrochemicals, fuels, fertilisers and metals from the plants around King Fahd Industrial Port and Ras Al-Khair. Their owners face extensive cargo-area gauging under the enhanced survey rules, and their charterers expect tank structure to be documented. We mobilise a team from India to Jubail and gauge cargo and ballast tanks, hull structure and deck piping between parcels, at anchorage or ahead of a docking.
Chemical tanker cargo areas
Coated and stainless cargo tanks, the ballast tanks and double bottoms around them, and the deck cargo and heating lines all age differently. We plan readings to the enhanced survey rules for chemical tankers under IACS UR Z10.3 and to the charterer's concerns.
Work between parcels and at anchorage
Chemical tankers often load several grades at several Jubail berths. Tanks cleaned and gas-freed between parcels, and waits at the anchorage for the next jetty, are the windows where cargo-area gauging fits without delaying the ship.
Fertiliser and mineral bulk holds
Bulk carriers loading at Ras Al-Khair and King Fahd Industrial Port carry cargoes whose residues attack hold steel in humid heat. We gauge frames, hopper plating and tank tops, and add crack detection where coatings have broken down.
Inspection services for ships at Jubail
Each service has its own page with the method, the class requirements and what the report contains.
Ultrasonic Thickness Measurement (UTM)
Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.
ExploreSpecial Survey Thickness Measurement
Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.
ExploreCAS (Condition Assessment Scheme)
Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.
ExploreCAP Thickness Measurement
Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.
ExploreESP Gauging
Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.
ExploreHull Structural Integrity
Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.
ExploreShip Piping Inspection
Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.
ExploreScrubber Piping Inspection
EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.
ExploreIHM (Inventory of Hazardous Materials)
IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.
ExploreMarine NDT Services
Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.
ExploreJubail Industrial City and Its Ports
Jubail was built as a planned industrial city, administered by the Royal Commission for Jubail and Yanbu, and its plants include SABIC affiliates, the Sadara chemical complex and the SATORP refinery. Two Mawani ports serve it. King Fahd Industrial Port handles the liquid and dry bulk of the industrial city: petrochemicals, refined products, liquefied gases, fertilisers and metals going out, feedstock and materials coming in. Jubail Commercial Port takes containers, general cargo, steel and project cargo. North along the coast, Ras Al-Khair Port serves the Ma'aden phosphate and aluminium complex, adding fertiliser and mineral bulk carriers to the mix.
The liquid side shapes the fleet. Chemical tankers here frequently load part cargoes at more than one Jubail berth, then top up at other Eastern Province or UAE ports, so a ship can spend days moving between jetties and the anchorage. Tank cleaning and gas-freeing between grades, ballast legs and berth waits create the windows in which cargo-area gauging is possible. Gas carriers load ammonia and other liquefied petrochemical gases for export, and bulk carriers can wait at anchorage for loading slots at the fertiliser berths, which gives time to open and inspect holds before the cargo goes in.
The inspection demand that results is technical rather than routine. Chemical tankers have their own IACS enhanced survey rule, UR Z10.3, and by the third renewal survey the cargo-area gauging is extensive. Many carry cargoes heated, which warms adjacent ballast tanks and double bottoms already sitting in hot, saline Gulf water, and coating failure there advances quickly. Stainless cargo tanks rarely waste, but the carbon-steel structure around them does, and deck lines, heating coils and manifold pipework suffer from both cargo and climate. Bulk carriers that have carried fertilisers or sulphur suffer from acidic residues in humid holds, and gauging finds thinning on frames, brackets and hopper plates.
Where Gauging Is Done in Jubail and Ras Al-Khair
Almost all gauging in Jubail is done afloat. At the liquid berths of King Fahd Industrial Port, terminal safety rules govern who boards and what work is allowed, so tank entry and gauging during a loading call need the terminal's agreement as well as the master's, and the tank must be certified gas-free. The anchorage gives more freedom: a ship waiting for its next jetty can open, ventilate and gauge cargo and ballast tanks with no other cargo operation nearby. At Jubail Commercial Port, general cargo and container ships can be gauged during cargo work on deck, in holds and in accessible tanks.
Jubail has no long-established drydock of its own. International Maritime Industries (IMI) is building up a large shipbuilding and repair yard at Ras Al-Khair, north of the city, and the Zamil yard in Dammam and ASRY in Bahrain are within reach for docking. For any of them, gauging the cargo area in Jubail before the ship leaves gives the repair specification real figures, and leaves the in-dock days for the bottom, the sea chests and the areas that can only be reached in dock.
- King Fahd Industrial Port liquid berths — cargo tank, deck line and heating coil gauging on chemical tankers between parcels, with terminal and master agreement
- Jubail anchorage — full cargo and ballast tank gauging on chemical and product tankers waiting for their next jetty, reached by launch
- Jubail Commercial Port — hold, hatch cover and deck gauging on general cargo, multipurpose and container ships during cargo operations
- Ras Al-Khair Port — hold frame, hopper plate and tank top gauging on bulk carriers loading fertiliser and minerals
- IMI yard, Ras Al-Khair — pre-docking and in-dock gauging for ships booked into the yard International Maritime Industries is building up there
- Gas carrier loading berths — hull, ballast tank and deck piping gauging on gas carriers, moved to the anchorage when the loading stay is too short
Thickness measurement through the survey cycle at Jubail
Class rules set the survey cycle, and the cycle sets how much gauging a ship needs. A superintendent planning a call at Jubail usually knows which survey is due; the table shows what the thickness measurement for each one typically involves. The exact extent comes from the class rules for the ship type and the surveyor attending, so the thickness measurement programme is agreed with the class before work starts.
| Survey | When it falls | What the thickness measurement usually covers |
|---|---|---|
| Annual survey | Every year, within three months of the anniversary date | General examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey. |
| Intermediate survey | In place of the second or third annual survey | Suspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age. |
| Renewal survey No. 1 | Around 5 years | The first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal. |
| Renewal survey No. 2 | Around 10 years | Wider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey. |
| Renewal survey No. 3 | Around 15 years | Extensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal. |
| Renewal survey No. 4 and later | Around 20 and 25 years | Gauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme. |
| Docking survey | Twice in each five-year period | Bottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged. |
Chemical Tanker Rules, Vetting and Regulation in Jubail
Ships in Jubail come under the Riyadh MoU for port state control, and inspectors at an industrial port pay close attention to cargo systems and deck structure. The heavier structural requirements come from the enhanced survey programme. SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code make enhanced surveys mandatory for oil tankers and bulk carriers; for chemical tankers the equivalent requirements come through class under IACS UR Z10.3. In each case, areas of substantial corrosion found at one survey are measured again at the surveys that follow, which is where planned gauging between surveys saves the owner time in port.
Commercial pressure is as strong as regulation. Chemical tankers face inspection by the oil majors and by the Chemical Distribution Institute, and charterers lifting from Jubail's plants look at tank coatings and structure when choosing tonnage; older product and chemical tankers are often asked for CAP. For these owners, thickness measurement in Saudi Arabia is as much a vetting matter as a class one. The Gulf is outside any emission control area, so the 0.50% global sulphur cap applies, and scrubbers are more common on the larger tankers and bulk carriers calling here than on small chemical parcel tankers. Saudi Arabia is also building up maritime industry at home, and the Ras Al-Khair yard is part of that effort.
Wherever a ship is outside a sulphur emission control area, the global 0.50% sulphur cap applies, and many of the ships calling at Jubail meet it with an exhaust gas cleaning system rather than compliant fuel. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service, especially on open-loop systems, and are worth adding to the gauging scope.
Typical thickness gauging jobs in Jubail
Ship inspection in Jubail centres on the cargo area. Most jobs are planned around a chemical tanker's parcel schedule or a bulk carrier's wait for a loading slot, and they feed an approaching survey, a charterer's request or a docking specification. Because the ships are rarely idle for long, the scope is agreed tank by tank with the chief officer, and the team works through whichever spaces are gas-free and ventilated on the day while the rest of the plan waits for the next window.
- A stainless-steel chemical tanker at the Jubail anchorage: double-bottom and wing ballast tanks gauged between parcels to give the owner corrosion trends before its third renewal survey
- A coated-tank product and chemical tanker: CAP-scope gauging of cargo tank deckheads, bulkheads and deck longitudinals, requested by a charterer before fixing the ship
- A bulk carrier waiting to load fertiliser at Ras Al-Khair: hold frame, bracket and hopper plate gauging, with magnetic particle testing at frame end connections
- A gas carrier between loadings: ballast tanks, double-bottom structure under the cargo tank supports and deck piping gauged at anchorage
- A chemical tanker bound for docking: deck cargo lines and heating coils gauged in Jubail so that pipe renewal can be ordered before the ship reaches the yard
How a thickness measurement job runs at Jubail
A gauging job at Jubail runs the same way whatever the ship type. The sequence below is what the superintendent, the attending surveyor and the yard can expect from us.
Jubail is reached through King Fahd International Airport near Dammam, with the team continuing north by road. King Fahd Industrial Port sits inside a controlled industrial city, so gate passes are tighter than at a commercial port: the ship's agent applies for them with each technician's passport and visa details, and terminal safety induction may be required before boarding. Anchorage work needs a launch from the port, again through the agent. Indian technicians travel on Saudi business visit visas, so we begin the application when the ship's parcel schedule settles and adjust travel as berth times move.
- Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
- We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
- Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
- Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
- Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
- The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.
Who does the work, and when class approval applies
Atlantis mobilises its inspection team from India to the vessel, for each job. There is no office or agent at the port; the team travels to the ship, which is why the planning step comes first. Work is planned and supervised by our Responsible NDT Level III, the founder, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has more than eleven years of international field experience. Technicians are qualified and certified under the company's written practice to ASNT SNT-TC-1A, and Atlantis is certified to ISO 9001 and ISO 14001.
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Governing codes and standards
- IACS UR Z7 hull classification surveys
- IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
- IACS UR Z17 approval of service suppliers
- SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
- MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
- The rules of the vessel's classification society
What you receive
- Thickness measurement report on the class formats, with sketches
- Summary of substantial and excessive corrosion against allowable margins
- Pitting and grooving records with depth and extent
- Piping wall-thickness tables with isometric sketches
- Magnetic particle or penetrant crack-detection reports
- Gauge calibration records and technician certificates
Industries served
- Chemical tankers
- Product tankers
- LPG and petrochemical gas carriers
- Bulk carriers
- General cargo and multipurpose ships
- Container ships
- Offshore support vessels
Frequently asked questions
Can you gauge cargo tanks on a chemical tanker between parcels in Jubail?
Yes, where the tank has been cleaned, ventilated and certified gas-free and the terminal allows entry. In practice the anchorage is the easier place: once the ship has finished at one jetty and is waiting for the next, the chief officer can release tanks in turn. We work through them in the order they become available and record which spaces remain for the next opportunity.
Do stainless steel cargo tanks need thickness measurement?
Stainless cargo tanks seldom lose thickness to general corrosion, and the attending surveyor decides whether readings are needed there. The carbon-steel structure around them, meaning ballast tanks, double bottoms, cofferdams and deck, corrodes like any other ship's steel in Gulf service. Gauging on a stainless chemical tanker therefore concentrates on those spaces and on any pitting found during visual inspection of the cargo tanks.
Our bulk carrier is loading at Ras Al-Khair. Can you gauge the holds first?
Holds can be gauged while the ship waits for its loading slot, provided they are clean and dry and access is safe. Fertiliser and similar residues, combined with Gulf humidity, attack frames, brackets and lower hopper plating, so we focus there and use magnetic particle testing at frame end connections where coatings have failed. Once loading starts, hold gauging is no longer practical.
Where do Jubail ships go to drydock, and can you gauge there too?
Ships from Jubail dock at a range of yards: ASRY in Bahrain, the Zamil yard in Dammam for smaller vessels, yards in the UAE and further afield, with the IMI yard at Ras Al-Khair building up its own role. We can gauge in Jubail before departure, at the docking yard, or both, sending a team from India to whichever location suits the repair schedule.
Does thickness measurement at Jubail need class approval?
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Planning a survey or a drydock?
Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Request a QuoteRequest a ship gauging quote
Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Speak to an ASNT NDT Level III
Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.