Maritime inspection · Spain
Ultrasonic Thickness Measurement in Ceuta on the Strait of Gibraltar
Ceuta is a Spanish port on the African shore of the Strait of Gibraltar. It is best known as a bunkering stop for ships that never intended to enter the Mediterranean ports further on, and as the other end of the ferry run from Algeciras. Stays are short and tied to fuel deliveries. Atlantis NDT mobilises an ultrasonic gauging team from India to the ship and shapes the readings around the time available alongside or at anchor.
Gauging fitted to a bunkering stop
A ship loading fuel at Ceuta has a defined number of hours alongside or at anchor. We choose the spaces that matter most, such as suspect ballast tanks or piping, so that the readings finish before the hoses come off.
One mobilisation across the Strait
Ceuta lies a short sea crossing from Algeciras and the Bay of Gibraltar. A team travelling for one ship can often continue to a second ship or a nearby drydock without a separate trip from India.
Passing tonnage with questions about steel
Bulk carriers, tankers and container ships on the Europe–Asia and Atlantic routes divert here for fuel. Owners use the stop to sample ballast tanks and decks before a charter, a sale or a docking.
Inspection services for ships at Ceuta
Each service has its own page with the method, the class requirements and what the report contains.
Ultrasonic Thickness Measurement (UTM)
Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.
ExploreSpecial Survey Thickness Measurement
Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.
ExploreCAS (Condition Assessment Scheme)
Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.
ExploreCAP Thickness Measurement
Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.
ExploreESP Gauging
Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.
ExploreHull Structural Integrity
Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.
ExploreShip Piping Inspection
Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.
ExploreScrubber Piping Inspection
EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.
ExploreIHM (Inventory of Hazardous Materials)
IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.
ExploreMarine NDT Services
Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.
ExploreCeuta: a Spanish enclave port with bunkering, ferries and fishing
Ceuta is a Spanish autonomous city on the southern side of the Strait of Gibraltar, bordering Morocco, and its port is run by the Autoridad Portuaria de Ceuta. The harbour sits at the foot of Monte Hacho on the eastern side of the isthmus, with commercial and passenger quays in the main basin and a separate fishing harbour. Vehicle and passenger ferries cross to Algeciras throughout the day, carrying commuters, holiday traffic and freight, and the crossing is the lifeline of the city.
Bunkering is the commercial engine. Ships passing through the Strait can stop at Ceuta, take fuel from barges or from the quay, and carry on without the delays of a larger port. Bulk carriers, tankers, container ships and car carriers all appear in the roadstead, usually for a few hours, sometimes longer when waiting for weather or instructions. Small cargo ships bring supplies for the city, and fishing boats work from their own basin. A cruise call is occasional rather than regular.
The geography brings challenges. The Strait funnels wind, and the easterly known as the Levante can build quickly and stop launch operations at the anchorage, while the opposing Poniente can bring a swell into the western side of the port. Strong currents flow through the Strait, and ships at anchor can swing in ways that make boarding uncomfortable. A Ceuta gauging job therefore carries weather risk in the plan, and for anything larger than a few spaces it makes sense to use Ceuta to collect data and finish the programme at a yard, where the ship is on the blocks and the technicians have full access.
Quays, anchorage and fishing basin: where gauging can be done in Ceuta
At the commercial quays, ships working cargo or waiting to bunker can be gauged in spaces that do not interfere with operations. Ballast tanks released by the chief officer, deck plating, hatch coamings, deck piping and the steering gear flat are the usual targets, and a tanker taking bunkers can have its deck structure and accessible tanks measured once the permit system is in place. Ferries on the Algeciras run are measured between crossings or during off-season stops, with attention on the vehicle deck, ramp and stern door.
At the anchorage, the plan depends on weather and on how long the ship stays. A launch arranged through the agent brings the technicians to the ship, and their ultrasonic gauges and magnetic particle kit travel in cases that go up the pilot ladder or accommodation ladder with them. Ceuta has facilities for light repairs and for small craft, but a full docking of a large merchant ship normally means a yard on the Spanish mainland or in the Bay of Gibraltar. The readings taken at Ceuta then go to that yard as a starting point, and the team can follow the ship there to finish the survey if the owner wants a single contractor for the whole job.
- Main commercial quays: ballast tank, deck and piping gauging on ships working cargo or waiting for bunkers
- Bunker berths and roadstead: targeted readings on tankers, bulkers and container ships taking fuel, by launch where the ship is at anchor
- Ferry berths: vehicle deck, ramp, stern door and ballast gauging on the Algeciras ro-pax ships between crossings
- Fishing basin: hull, tank and deck gauging on fishing boats hauled or moored for maintenance
- Drydocks in the Bay of Gibraltar and on the mainland: where gauging begun in Ceuta can be finished during the docking survey
Thickness measurement through the survey cycle at Ceuta
Class rules set the survey cycle, and the cycle sets how much gauging a ship needs. A superintendent planning a call at Ceuta usually knows which survey is due; the table shows what the thickness measurement for each one typically involves. The exact extent comes from the class rules for the ship type and the surveyor attending, so the thickness measurement programme is agreed with the class before work starts.
| Survey | When it falls | What the thickness measurement usually covers |
|---|---|---|
| Annual survey | Every year, within three months of the anniversary date | General examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey. |
| Intermediate survey | In place of the second or third annual survey | Suspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age. |
| Renewal survey No. 1 | Around 5 years | The first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal. |
| Renewal survey No. 2 | Around 10 years | Wider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey. |
| Renewal survey No. 3 | Around 15 years | Extensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal. |
| Renewal survey No. 4 and later | Around 20 and 25 years | Gauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme. |
| Docking survey | Twice in each five-year period | Bottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged. |
Spanish regulation at the Strait and what drives gauging here
Although Ceuta lies on the African coast, it is Spanish territory and part of the EU, and port state control on foreign ships is carried out under the Paris MoU by Spanish marine inspectors, working for the Dirección General de la Marina Mercante through the local Capitanía Marítima. The port lies east of the western boundary of the Mediterranean emission control area, so ships bunkering here operate under the 0.10% sulphur limit or run exhaust gas cleaning systems, and scrubber piping is a recurring subject of gauging on the ships that pass through.
The commercial context is the Strait itself. Ships in transit take fuel at Ceuta because it is convenient and competitive against other Strait ports, and superintendents use the short stay to settle small questions about steel. Typical drivers are a port state control remark, a charterer's request for a condition report, an upcoming sale or a surveyor's note at the last annual survey. The EU Emissions Trading System has covered shipping since 2024 and FuelEU Maritime since 2025, so older ships are under pressure, and a current gauging record shows a buyer or an owner what steel work remains. Owners should also remember that ships calling at EU ports are expected to hold an Inventory of Hazardous Materials, which is separate from thickness gauging but part of the same compliance picture.
Since 1 May 2025 the whole Mediterranean has been a sulphur emission control area, so ships calling at Ceuta burn 0.10% sulphur fuel or run a scrubber. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service and are worth adding to the gauging scope at every docking.
Typical thickness gauging jobs in Ceuta
Ceuta jobs are short, specific and tied to a fuel delivery or a ferry timetable. We ask for the expected time alongside or at anchor, the spaces the ship can make safe and the report format wanted, then choose a scope that fits. Larger programmes are planned for a nearby yard. Typical requests include:
- Ballast tank and deck gauging on a bulk carrier at anchor during bunkering, ahead of a special survey at a yard later in the year.
- Pre-purchase condition gauging on a product tanker, sampling deck plating, accessible ballast tanks and deck piping during a bunker stop.
- Vehicle deck, ramp and stern door readings on a Strait ro-pax ferry during an off-season lay-over.
- Fire main, ballast and sea-water piping gauging on a container ship after a port state control remark on corroded pipework.
- Hull and tank gauging on a fishing boat out of the water for maintenance in the fishing basin.
How a thickness measurement job runs at Ceuta
A gauging job at Ceuta runs the same way whatever the ship type. The sequence below is what the superintendent, the attending surveyor and the yard can expect from us.
Ceuta has no scheduled commercial airline service of significance, so technicians normally fly from India to Málaga, Jerez or Seville through a European or Gulf hub, then reach Algeciras by road and cross by ferry. The crossing is short but is subject to weather. Spain is in the Schengen area and Schengen visas are needed before travel dates are set. The ship's agent arranges port access, ISPS passes and any launch for the anchorage.
- Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
- We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
- Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
- Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
- Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
- The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.
Who does the work, and when class approval applies
Atlantis mobilises its inspection team from India to the vessel, for each job. There is no office or agent at the port; the team travels to the ship, which is why the planning step comes first. Work is planned and supervised by our Responsible NDT Level III, the founder, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has more than eleven years of international field experience. Technicians are qualified and certified under the company's written practice to ASNT SNT-TC-1A, and Atlantis is certified to ISO 9001 and ISO 14001.
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Governing codes and standards
- IACS UR Z7 hull classification surveys
- IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
- IACS UR Z17 approval of service suppliers
- SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
- MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
- The rules of the vessel's classification society
What you receive
- Thickness measurement report on the class formats, with sketches
- Summary of substantial and excessive corrosion against allowable margins
- Pitting and grooving records with depth and extent
- Piping wall-thickness tables with isometric sketches
- Magnetic particle or penetrant crack-detection reports
- Gauge calibration records and technician certificates
Industries served
- Bulk carriers
- Crude and product tankers
- Container ships
- Car carriers
- Ro-pax ferries on the Algeciras route
- Bunker barges and small tankers
- Fishing vessels and tugs
Frequently asked questions
Is a bunker stop at Ceuta long enough to gauge a ship?
For targeted work, usually. A few hours is enough for a suspect ballast tank, a deck area or a run of piping. A full renewal survey does not fit. Send us the expected stay and the list of spaces, and we will say plainly what is realistic.
Can you gauge a ship at the Ceuta anchorage?
Yes, when weather allows. Boarding is by launch through the agent, and a strong Levante can stop it. Our plan always includes a margin for weather, and where the ship will soon berth or dock we may suggest moving the work alongside.
Where would a ship dock if the Ceuta readings show serious wastage?
That is the owner's and class's decision. Nearby options are yards in the Bay of Gibraltar and on the Spanish mainland. We give the chosen yard the Ceuta readings as an early steel estimate, and the technicians can continue to the yard for the full survey.
Does the Mediterranean emission control area apply at Ceuta?
Yes. The port lies inside the area, so ships here run on compliant fuel or use a scrubber. Where a scrubber is fitted, we recommend gauging the wash-water and overboard piping, because acidic wash water and shell connections wear steel faster than most owners expect.
Does thickness measurement at Ceuta need class approval?
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Planning a survey or a drydock?
Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Request a QuoteRequest a ship gauging quote
Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Speak to an ASNT NDT Level III
Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.