Maritime inspection · United Kingdom
Thickness Measurement for Commercial Ships at the Port of Barrow
Barrow-in-Furness, on the Furness peninsula in Cumbria, is best known for the BAE Systems shipyard that builds the Royal Navy's submarines. Beside it, Associated British Ports runs a commercial port serving offshore wind farms in the Irish Sea, the energy industry around Morecambe Bay, and bulk and project cargoes. Ships here lie in enclosed docks entered through a lock from the Walney Channel. Our technicians come from India for each job and work only on commercial vessels in the port, never on the naval programme.
Offshore wind's base on the coast
Operations and maintenance bases for the wind farms off Walney Island work from Barrow, so crew transfer and offshore support vessels are regular visitors. Between rotations, their hulls, tanks, deck cranes and boarding-equipment foundations can be gauged and checked for cracks alongside.
Enclosed docks behind a lock
Ships pass from the Walney Channel through a lock into Ramsden Dock and the inner basins, where the water stays at one level. A moored vessel lies steady whatever the large tide outside is doing, so a tank programme can run across several days without disturbance.
Kept apart from the submarine yard
The BAE Systems site shares the dock estate but is a restricted naval facility. Our work at Barrow is limited to commercial ships at ABP's quays, arranged through their owners and agents and under the port's own access controls.
Inspection services for ships at Barrow-in-Furness
Each service has its own page with the method, the class requirements and what the report contains.
Ultrasonic Thickness Measurement (UTM)
Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.
ExploreSpecial Survey Thickness Measurement
Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.
ExploreCAS (Condition Assessment Scheme)
Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.
ExploreCAP Thickness Measurement
Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.
ExploreESP Gauging
Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.
ExploreHull Structural Integrity
Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.
ExploreShip Piping Inspection
Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.
ExploreScrubber Piping Inspection
EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.
ExploreIHM (Inventory of Hazardous Materials)
IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.
ExploreMarine NDT Services
Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.
ExploreBarrow: a dock port between Walney Island and the Furness peninsula
Barrow-in-Furness grew in the nineteenth century from a small village into an industrial town built on iron, steel, shipbuilding and its docks. The port lies behind Walney Island, a long, low island that shelters the Walney Channel from the Irish Sea, and ships approach from Morecambe Bay along a buoyed channel before locking into the docks. There are four main basins, Ramsden, Buccleuch, Cavendish and Devonshire Docks, and part of the estate is used by BAE Systems, whose Devonshire Dock Hall is one of the largest shipbuilding halls in Europe. The tidal range in the approaches is large and the channel is prone to silting, so arrivals and departures are planned around high water with a pilot on board and tugs on hand.
The commercial port, run by Associated British Ports, has found new work in energy. Offshore wind farms west of Walney and in the eastern Irish Sea are serviced from bases in the docks, with crew transfer vessels and offshore support ships coming and going regularly. The port also handles cargo for the gas industry around Morecambe Bay, bulk and general cargoes, and project loads, including heavy equipment for the shipyard and for energy sites. Specialist ships that carry nuclear materials for the Sellafield site have been based at Barrow for many years. In 2025 the port was granted the title Royal Port of Barrow in recognition of its part in national security, and ABP has published a long-term plan to grow its energy, defence and cargo business.
The ships calling at Barrow are a specialised mix. Crew transfer vessels are small and fast and take technicians out to the wind farms day after day; offshore support and service vessels stay at sea for longer rotations; cargo ships and coasters call for bulk and project loads; and the shipyard brings in heavy-lift vessels with equipment. For gauging, the important point is that many of these vessels return to Barrow often and spend time in the enclosed docks between trips, which gives access without the pressure of a quick cargo turnaround. Winter weather in the Irish Sea also increases downtime for the smallest vessels, and the days when crew transfer vessels cannot sail are often given over to maintenance and inspection.
Where ships are gauged at Barrow
Commercial work takes place at ABP's quays in Ramsden Dock and the adjoining basins. Offshore support and crew transfer vessels lie at their operators' berths between trips, where hull plating, fuel and water tanks, deck structure, boarding-equipment foundations and piping can be gauged and checked for cracks. Cargo ships and coasters at the general cargo berths are worked around loading and discharge, with holds measured as they empty. The water in the docks stays at a constant level, so access is steady once a vessel is moored and the crew has prepared the spaces.
Barrow's commercial docks are not a merchant ship-repair centre, so vessels from the port are docked at yards on the Mersey, in Northern Ireland, in Scotland or further afield. The BAE Systems shipyard and its facilities are reserved for the naval programme and play no part in any commercial job. For owners, the realistic Barrow work is in-service gauging alongside, used to plan the next docking or to document condition for a charter, a sale or a survey. A vessel laid up between offshore contracts gives the longest window and allows every tank to be opened in turn.
- Offshore wind operator berths — hull, tank, deck and boarding-equipment foundation gauging on crew transfer and support vessels between trips.
- Ramsden Dock cargo quays — hold, hatch coaming and ballast tank readings on coasters and cargo ships during loading or discharge.
- Project cargo berths — deck and crane pedestal checks on heavy-lift ships while equipment is landed.
- Lay-by berths in the inner basins — longer condition surveys on vessels waiting between contracts.
- Weather downtime alongside — tank and piping programmes on small vessels kept in port by Irish Sea conditions.
Thickness measurement through the survey cycle at Barrow-in-Furness
How much steel has to be gauged depends on which survey the ship is due for, its type and its age. The pattern below is the usual one under IACS unified requirements; the attending surveyor and the class rules for the ship decide the final extent. For a ship calling at Barrow-in-Furness, we agree the programme with the class and the owner before the team mobilises.
| Survey | When it falls | What the thickness measurement usually covers |
|---|---|---|
| Annual survey | Every year, within three months of the anniversary date | General examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey. |
| Intermediate survey | In place of the second or third annual survey | Suspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age. |
| Renewal survey No. 1 | Around 5 years | The first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal. |
| Renewal survey No. 2 | Around 10 years | Wider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey. |
| Renewal survey No. 3 | Around 15 years | Extensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal. |
| Renewal survey No. 4 and later | Around 20 and 25 years | Gauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme. |
| Docking survey | Twice in each five-year period | Bottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged. |
Security, regulation and the energy trade at Barrow
Barrow is unusual among commercial ports because of the defence and nuclear activity around it. The submarine programme and the movement of nuclear materials bring extra security controls on parts of the dock estate on top of the normal ISPS regime, and visitors are expected to follow site rules to the letter. For commercial ships, port state control is carried out by the Maritime and Coastguard Agency under Paris MoU procedures applied through UK law, and visiting ships are expected to carry an Inventory of Hazardous Materials under the ship recycling rules the UK retained from EU legislation.
Offshore wind vessels follow their own rules. Crew transfer vessels are usually small and certified under workboat or high-speed craft codes administered by the flag state, while larger service and support vessels follow class rules and the full survey cycle. Either way, operators are under pressure to keep vessels available through the year, so inspection is planned for weather downtime or scheduled maintenance. Thickness readings on hulls, tanks and boarding-equipment foundations, and crack checks on welded structure that takes repeated impact from turbine landings, help them avoid unplanned time off hire.
Wherever a ship is outside a sulphur emission control area, the global 0.50% sulphur cap applies, and many of the ships calling at Barrow-in-Furness meet it with an exhaust gas cleaning system rather than compliant fuel. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service, especially on open-loop systems, and are worth adding to the gauging scope.
Common gauging work at Barrow-in-Furness
Most Barrow jobs come from offshore energy operators and from owners of cargo ships calling with bulk or project loads. Offshore work is planned around vessel rotations and weather: a crew transfer vessel kept in port by a gale is a chance to gauge her hull and tanks, while an offshore support vessel between contracts can have a full survey. Cargo ship work is planned around loading and discharge in the docks. Every job is for a commercial vessel and is arranged through the owner or agent, with access under the port's security rules and passes confirmed before the team leaves India.
- Hull and tank gauging on a crew transfer vessel during weather downtime between wind farm trips.
- MPI on the bow fender structure of a crew transfer vessel after repeated turbine landings.
- Condition survey of an offshore support vessel between contracts: tanks, deck, crane foundations and piping.
- Hold and ballast tank readings on a coaster or cargo ship while she loads in Ramsden Dock.
- Deck and crane pedestal checks on a heavy-lift ship landing project cargo.
How a thickness measurement job runs at Barrow-in-Furness
The sequence for a thickness measurement job at Barrow-in-Furness is short and written down, so the yard, the surveyor and the superintendent know who arranges what.
Manchester Airport is the usual international gateway; from there the team takes the train north through Lancaster and around the Furness coast to Barrow, or travels by road. Technicians come from India on UK visas, and because Barrow's security arrangements add a step, we allow extra time between confirming a job and boarding. The vessel's owner or agent arranges port passes with ABP and confirms the berth, the lock time and any additional site rules before the team travels.
- Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
- We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
- Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
- Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
- Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
- The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.
Who does the work, and when class approval applies
We send the team from India to the ship for each job rather than keeping staff at the port, and plan the mobilisation around visas and the vessel's itinerary. The work is planned and supervised by the founder, our Responsible NDT Level III (ASNT NDT Level III in UT, RT, MT, PT and VT, with more than eleven years of international field experience). Technicians hold certification under the company's written practice to ASNT SNT-TC-1A; Atlantis is ISO 9001 and ISO 14001 certified.
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Governing codes and standards
- IACS UR Z7 hull classification surveys
- IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
- IACS UR Z17 approval of service suppliers
- SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
- MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
- The rules of the vessel's classification society
What you receive
- Thickness measurement report on the class formats, with sketches
- Summary of substantial and excessive corrosion against allowable margins
- Pitting and grooving records with depth and extent
- Piping wall-thickness tables with isometric sketches
- Magnetic particle or penetrant crack-detection reports
- Gauge calibration records and technician certificates
Industries served
- Crew transfer vessels
- Offshore support and service vessels
- Coasters
- General cargo ships
- Heavy-lift and project cargo ships
- Survey vessels
Frequently asked questions
Do you work on submarines or at the BAE Systems shipyard?
No. The shipyard and the submarine programme are a restricted naval site and are not part of our work. At Barrow we gauge commercial vessels at Associated British Ports' quays, such as offshore wind vessels, cargo ships and coasters, under the port's normal access arrangements and with passes arranged by the vessel's owner or agent.
Can crew transfer vessels be gauged at Barrow without losing working days?
Usually, by using weather downtime and planned maintenance periods. When conditions keep a crew transfer vessel in port, the team can gauge hull plating, tanks and foundations alongside and check bow fenders and welded structure for cracks with magnetic particle inspection. We agree a standing scope with the operator and fit it to the days the team is on site.
How do ships get into the docks at Barrow?
Through a lock from the Walney Channel, timed around high water. The approach crosses a large tidal range and a channel that needs regular maintenance, so arrivals and departures follow the tide and the pilot's advice. Once inside, the water level stays constant, and gauging continues through the tide without disturbing moorings or access to the ship.
Where are vessels from Barrow drydocked?
At yards elsewhere, on the Mersey, in Northern Ireland, in Scotland or further afield, depending on size and availability. We gauge at Barrow beforehand, so the owner can give the yard a list of plating and piping to renew, and the docking period can be planned around known work rather than findings made once the vessel is dry.
Does thickness measurement at Barrow-in-Furness need class approval?
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Planning a survey or a drydock?
Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Request a QuoteRequest a ship gauging quote
Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Speak to an ASNT NDT Level III
Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.