Maritime inspection · United Kingdom

Hull, Tank and Piping Thickness Measurement for Ships at Greenock

Greenock stands where the River Clyde opens into its firth, and its waterfront combines Ocean Terminal's container and cruise berths with ship repair at the Garvel dry dock. West-coast ferries, newbuilds from the Port Glasgow yard and feeder container ships all pass through, and a docking or a lay-by berth on the Clyde gives the time thickness gauging needs. We bring technicians from India to the ship, whether she is in the dock, alongside or at anchor off the town.

Docking periods at Garvel

Dales Marine Services runs the Garvel dry dock in Greenock, used by ferries and other vessels for refits and class dockings. With the hull dry, bottom shell, sea chests and the stern area can be gauged and the steel list agreed before the dock is flooded again.

Feeder and cruise calls at Ocean Terminal

Greenock Ocean Terminal handles container feeders and is the Clyde's main cruise berth. Feeder ships turn round quickly, so their gauging is targeted and planned well ahead, while cruise ships offer a few hours alongside for piping and deck work.

Lay-by berths and anchorages on the Clyde

Ships waiting for orders, a docking slot or a new owner can lie at the Clyde's lay-by berths or anchor off Greenock. Longer stays like these allow full tank programmes, owner's condition surveys and pre-purchase gauging without the pressure of a cargo schedule.

Inspection services for ships at Greenock

Each service has its own page with the method, the class requirements and what the report contains.

Ultrasonic Thickness Measurement (UTM)

Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.

Explore

Special Survey Thickness Measurement

Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.

Explore

CAS (Condition Assessment Scheme)

Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.

Explore

CAP Thickness Measurement

Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.

Explore

ESP Gauging

Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.

Explore

Hull Structural Integrity

Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.

Explore

Ship Piping Inspection

Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.

Explore

Scrubber Piping Inspection

EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.

Explore

IHM (Inventory of Hazardous Materials)

IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.

Explore

Marine NDT Services

Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.

Explore

Greenock on the Firth of Clyde: terminal, repair yard and anchorage

The Clyde narrows above Greenock, and the town has long marked the point where seagoing ships give way to river traffic heading up to Glasgow. Below it, the Firth of Clyde opens south towards Arran and the North Channel, giving a sheltered approach from the Irish Sea that the Kintyre peninsula and the islands screen from the full Atlantic swell. The stretch of water off Greenock and Gourock, known as the Tail of the Bank, has long served as an anchorage for ships waiting to go upriver or out to sea. Peel Ports operates the port through Clydeport, providing pilotage and managing the terminals, docks and berths from Greenock up to Glasgow. Ships of moderate draught can therefore choose between a terminal berth, a repair dock, a lay-by quay and an anchorage within a short distance of one another.

Greenock Ocean Terminal is the main commercial berth on this part of the river, handling container feeder services that connect Scotland's west coast with larger hub ports, and doubling as the Clyde's principal cruise terminal, with a dedicated building for passengers. The region's ferry network is centred on the firth, with CalMac routes from Gourock, Wemyss Bay and Ardrossan crossing to Dunoon, Bute and Arran, and the ferries that serve them need regular dockings, some of which are taken on the Clyde. Shipbuilding continues upriver at Port Glasgow, where Ferguson Marine builds ferries, and at the naval yards in Glasgow itself. General cargo and bulk ships also work the river's other berths, so the mix of tonnage passing Greenock is wider than its own terminal suggests.

Ship repair on this stretch of the Clyde is concentrated at Greenock. The Garvel dry dock, operated by Dales Marine Services, takes ferries and other vessels for refits and dockings, including newbuilds before delivery: the Ferguson-built ferry Glen Rosa went into the dock in 2025. Upriver at Inchgreen, Peel Ports owns Scotland's largest drydock, which has been out of regular use for many years and has been the subject of plans to bring it back into service, most recently for ship decommissioning. Weather on the Clyde is wet and windy rather than icy, and the sheltered upper firth keeps most work possible all year, though strong westerlies can interrupt boat transfers to ships at anchor and slow outdoor work on deck.

Docks, berths and anchorages for gauging on the Clyde

For a renewal survey or a docking survey, the Garvel dry dock is the place at Greenock where a hull can be gauged out of the water. The team works to the yard's programme and the agreed TM plan with the class surveyor attending, starting on the bottom shell, sea chests and stern frame while staging and lighting are in place, then moving to tanks as they are gas-freed. Because the dock is sized for ferries and coastal and short-sea ships rather than large ocean-going tonnage, bigger vessels trading to the Clyde dock elsewhere, and a Greenock call before that docking is a good time to measure the steel the yard will need to renew.

Afloat, the options depend on the ship's business. Feeder container ships at Ocean Terminal turn round in hours, so their scope is limited to what can be done during cargo work: deck plating, hatch coamings, air pipes and engine-room piping. Cruise ships allow a similar window. Ships with time to spare, waiting for a docking slot, laid up, or changing hands, can lie at a lay-by berth such as James Watt Dock or anchor off Greenock, where the agent arranges boat transfers. Those longer stays suit complete ballast tank programmes and the condition surveys that buyers and owners rely on.

  • Garvel dry dock — bottom shell, sea chest, stern and tank gauging during refits and class dockings, worked to the yard programme.
  • Greenock Ocean Terminal — deck, hatch coaming and piping readings on container feeders and cruise ships during their time alongside.
  • James Watt Dock and other Clyde lay-by berths — full tank programmes on ships waiting for a docking slot, laid up or changing hands.
  • Anchorages off Greenock — targeted deck and tank gauging by boat transfer on ships awaiting orders or a berth upriver.
  • Ferry lay-over berths on the firth — sea-water piping, car-deck and void-space checks on ferries between sailings or out of season.

Thickness measurement through the survey cycle at Greenock

Class rules set the survey cycle, and the cycle sets how much gauging a ship needs. A superintendent planning a call at Greenock usually knows which survey is due; the table shows what the thickness measurement for each one typically involves. The exact extent comes from the class rules for the ship type and the surveyor attending, so the thickness measurement programme is agreed with the class before work starts.

SurveyWhen it fallsWhat the thickness measurement usually covers
Annual surveyEvery year, within three months of the anniversary dateGeneral examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey.
Intermediate surveyIn place of the second or third annual surveySuspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age.
Renewal survey No. 1Around 5 yearsThe first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal.
Renewal survey No. 2Around 10 yearsWider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey.
Renewal survey No. 3Around 15 yearsExtensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal.
Renewal survey No. 4 and laterAround 20 and 25 yearsGauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme.
Docking surveyTwice in each five-year periodBottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged.

The Clyde's regulatory picture: MCA, recycling rules and ferries

Port state control on the Clyde is in the hands of the Maritime and Coastguard Agency, applying the Paris MoU inspection regime through UK law, and the feeder container ships and occasional bulk and general cargo ships calling here are its usual subjects. Greenock lies on the west coast, outside the North Sea emission control area that begins on the far side of Scotland. Feeders that continue to the east coast or the Continent switch fuel or rely on their scrubbers when they enter it, so their wash-water and fuel piping work under two regimes on a single rotation, which is worth remembering when the piping scope is drawn up.

Ship recycling is an unusual part of the picture here. The UK kept the EU Ship Recycling Regulation in its own law after Brexit, so UK-flagged ships must be recycled at approved facilities and carry an Inventory of Hazardous Materials, and ships of other flags calling at UK ports are expected to have one as well. With the Hong Kong Convention in force internationally since June 2025 and plans to use Inchgreen for decommissioning, owners of older tonnage on the Clyde increasingly need a clear record of their ship's condition. Ferries add a domestic dimension: UK passenger ships are surveyed by the MCA, and their operators plan steel and piping renewal around tight seasonal timetables.

Wherever a ship is outside a sulphur emission control area, the global 0.50% sulphur cap applies, and many of the ships calling at Greenock meet it with an exhaust gas cleaning system rather than compliant fuel. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service, especially on open-loop systems, and are worth adding to the gauging scope.

Gauging work we see at Greenock

Greenock jobs fall into three kinds. Docking work at Garvel follows the yard's programme and the class survey, with readings feeding the steel renewal list while the ship is in the dock. Short calls at Ocean Terminal need a scope fixed in advance and tanks prepared by the crew. Longer stays at lay-by berths and anchorages, which come with sales, lay-ups and waits for a docking slot, allow the widest programmes. We plan each with the superintendent, the agent and, where the ship is docking, the yard, so that staging, gas-freeing and access are ready when the team arrives. Readings are reported against the ship's frames and strakes.

  • Renewal-survey gauging on a ferry in the Garvel dry dock, with substantial corrosion marked on the shell for the yard to renew before undocking.
  • Pre-docking steel estimate for a container feeder, gauged over successive calls at Ocean Terminal ahead of a docking elsewhere.
  • Pre-purchase hull and tank gauging on a ship laid up at a Clyde lay-by berth, scoped by the buyer's technical adviser.
  • Scrubber wash-water and overboard piping UT on a cruise ship during a summer call at Greenock.
  • Sea chest, sea-water piping and stern area checks on a workboat or offshore vessel during a short docking.

How a thickness measurement job runs at Greenock

The sequence for a thickness measurement job at Greenock is short and written down, so the yard, the surveyor and the superintendent know who arranges what.

Glasgow Airport is the closest international airport, with Glasgow Prestwick and Edinburgh as alternatives, and trains and roads run from Glasgow along the south bank of the Clyde to Greenock. The technicians are mobilised from India and need UK visas, so early notice of a docking date or a ship's lay-by period helps. Dry dock access is arranged with Dales Marine Services, terminal passes through Peel Ports, and boat transfers to anchored ships are booked by the ship's agent.

  • Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
  • We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
  • Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
  • Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
  • Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
  • The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.

Who does the work, and when class approval applies

We send the team from India to the ship for each job rather than keeping staff at the port, and plan the mobilisation around visas and the vessel's itinerary. The work is planned and supervised by the founder, our Responsible NDT Level III (ASNT NDT Level III in UT, RT, MT, PT and VT, with more than eleven years of international field experience). Technicians hold certification under the company's written practice to ASNT SNT-TC-1A; Atlantis is ISO 9001 and ISO 14001 certified.

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Governing codes and standards

  • IACS UR Z7 hull classification surveys
  • IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
  • IACS UR Z17 approval of service suppliers
  • SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
  • MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
  • The rules of the vessel's classification society

What you receive

  • Thickness measurement report on the class formats, with sketches
  • Summary of substantial and excessive corrosion against allowable margins
  • Pitting and grooving records with depth and extent
  • Piping wall-thickness tables with isometric sketches
  • Magnetic particle or penetrant crack-detection reports
  • Gauge calibration records and technician certificates

Industries served

  • Ro-pax and passenger ferries
  • Container feeder ships
  • Cruise ships
  • General cargo and bulk carriers
  • Newbuild ferries completing outfitting
  • Offshore vessels and workboats
  • Laid-up ships awaiting sale or recycling

Frequently asked questions

Can you gauge a ship in the Garvel dry dock in Greenock?

Yes, for the owner or manager of a ship docking there. We follow the yard's programme and the TM plan agreed with the class surveyor, take shell and sea chest readings while the hull is dry, and move to tanks as they are certified gas-free. Areas of substantial or excessive corrosion are marked on the steel and passed to the yard straight away, so renewal can be ordered before undocking.

What can be gauged on a container feeder during a call at Ocean Terminal?

A feeder's call is short and cargo work dominates it, so the scope is targeted: deck plating, hatch covers and coamings, air pipes and engine-room piping, plus a ballast tank if the crew has emptied and ventilated it beforehand. Repeated calls on a regular rotation let a larger programme be completed in stages, which suits a pre-docking steel estimate.

Is the Inchgreen dry dock available for ship repair?

Inchgreen, owned by Peel Ports, has been out of regular use for many years, and recent plans for it have focused on ship decommissioning rather than repair. Owners planning a Clyde docking should check its status at the time; for most ships the working option at Greenock is the Garvel dry dock, and larger vessels dock at yards elsewhere in the UK or Europe.

Can a laid-up ship be surveyed at anchor off Greenock?

Yes, with boat transfers arranged by the agent and when the weather permits. A laid-up or waiting ship can have tanks emptied and ventilated over several days, so a full condition survey is realistic: shell, deck, ballast and cargo spaces, and piping. That record is what a buyer, an insurer or an owner reactivating the ship usually needs before committing to repairs.

How is gauging arranged on a west-coast ferry docking on the Clyde?

We work with the operator's superintendent and the yard from the docking specification. Ferries have tight seasonal timetables, so the plan sets out which car-deck, void-space, ballast tank and sea-water piping readings are needed and in what order, and the UK visa and travel arrangements are made against the docking date. Findings are shared daily so renewal can be agreed within the docking period.

Does thickness measurement at Greenock need class approval?

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Planning a survey or a drydock?

Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.

Request a Quote

Request a ship gauging quote

Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.








Speak to an ASNT NDT Level III

Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.