Maritime inspection · Malta
Ultrasonic Thickness Measurement in Malta: Grand Harbour, Marsaxlokk and Offshore
Malta sits on the main east–west Mediterranean route and administers Europe's largest ship register, so ships of every type pass its ports, drydocks and offshore bunkering areas. Whether a ship is in drydock at Grand Harbour, working cargo at the Malta Freeport or lying at anchor off the south-east coast between voyages, Atlantis NDT can fly a thickness measurement team in from India and gauge it within the window the owner has.
Drydocks in Grand Harbour
Palumbo Malta Shipyard in the historic dock area at Cospicua docks cruise ships, tankers, bulk carriers and offshore units, so renewal surveys and full hull gauging are routinely carried out on the island.
Gauging during a bunkering stop
Ships calling at the offshore anchorages, including Hurd's Bank, for fuel, stores or orders can be gauged by launch while they wait, without diverting to a port or booking a berth.
Managers of the Malta-flag fleet
Many ship managers and owners operate from Malta because of its flag, so decisions about gauging ships trading worldwide are often taken on the island, close to the yard and the surveyors.
Inspection services for ships at Malta
Each service has its own page with the method, the class requirements and what the report contains.
Ultrasonic Thickness Measurement (UTM)
Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.
ExploreSpecial Survey Thickness Measurement
Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.
ExploreCAS (Condition Assessment Scheme)
Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.
ExploreCAP Thickness Measurement
Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.
ExploreESP Gauging
Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.
ExploreHull Structural Integrity
Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.
ExploreShip Piping Inspection
Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.
ExploreScrubber Piping Inspection
EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.
ExploreIHM (Inventory of Hazardous Materials)
IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.
ExploreMarine NDT Services
Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.
ExploreMalta's ports, anchorages and the ships that use them
Malta's maritime activity is spread across two main ports and the sea around them. Grand Harbour, between Valletta and the Three Cities, holds the Valletta Cruise Port and the island's ship-repair yard, Palumbo Malta Shipyard, in the historic dock area at Cospicua. Marsaxlokk, in the south-east, is home to the Malta Freeport container transhipment terminal at Birżebbuġa and to oil storage and bulk terminals. Offshore, designated anchorage and bunkering areas, including Hurd's Bank, serve ships calling only for fuel, stores, crew changes or orders, and make Malta a well-used bunkering location on the central Mediterranean route.
That mix creates a broad inspection demand. The shipyard docks cruise ships, ferries, tankers, bulk carriers and offshore units for repair and refit, and its dockings are where renewal surveys and full hull gauging take place. The Freeport's transhipment calls bring large container ships whose scrubber piping and ballast tanks can be gauged during the cargo exchange. The offshore anchorages bring something less common: ships with no berth booking at all, lying at anchor for a day or two for bunkers or orders, which a superintendent can use for pre-purchase, on-hire, off-hire or close-out gauging without diverting the ship into port. On an island this size, all three are within a short distance of each other.
The Malta flag adds another layer. Transport Malta's Merchant Shipping Directorate administers Europe's largest ship register, and Malta-flagged ships trade worldwide, with statutory surveys carried out by the classification societies that Malta authorises as recognised organisations. Many ship-management and owning companies are established on the island because of the flag, so technical decisions for ships trading far from the Mediterranean are often made in Malta. For those managers, a Malta mobilisation can also be the starting point for gauging a fleet ship calling elsewhere in the central Mediterranean, in Sicily or southern Italy.
Where thickness gauging happens around Malta
Docking work centres on the Grand Harbour drydock complex at Palumbo Malta Shipyard, where graving docks of different sizes take ships from ferries and offshore vessels up to large cruise ships and tankers. A docking gives the full range of access: bottom shell and sea chests in the dock, cargo and ballast tanks once gas-freed and ventilated, and staging for close-up survey in the larger spaces. Cruise lines use the yard for refurbishments, which bring scrubber and exhaust system work alongside hull items, and the gauging is sequenced around the yard's own trades.
Outside the yard, Marsaxlokk handles the Freeport's container ships and the tankers and bulk carriers using its oil and bulk terminals, with gauging done alongside under each terminal's safety rules. The Valletta cruise berths give turnaround-day access. Thickness gauging at anchor, at Hurd's Bank or the other designated areas, is done from a launch arranged through the agent and depends on the weather: these areas are exposed, and a sea state that is fine for bunkering may still rule out safe boarding with equipment. Where conditions are marginal, the work can move to a more sheltered spot or to the ship's next call.
- Palumbo Malta Shipyard, Grand Harbour — drydock gauging of bottom shell, sea chests and tanks, with close-up survey support during repairs, refits and renewal surveys
- Valletta Cruise Port — turnarounds in Grand Harbour, giving a day for exhaust gas cleaning pipework and items from the previous survey
- Malta Freeport, Birżebbuġa — transhipment calls on large container ships, used for ballast tank close-out readings and scrubber discharge line checks
- Oil and bulk terminals at Marsaxlokk — gauging of deck, deck piping and accessible ballast tanks on tankers and bulk carriers within the cargo window
- Hurd's Bank and the designated offshore anchorages — pre-purchase, on-hire, off-hire and close-out gauging by launch while ships bunker or wait for orders
Thickness measurement through the survey cycle at Malta
Class rules set the survey cycle, and the cycle sets how much gauging a ship needs. A superintendent planning a call at Malta usually knows which survey is due; the table shows what the thickness measurement for each one typically involves. The exact extent comes from the class rules for the ship type and the surveyor attending, so the thickness measurement programme is agreed with the class before work starts.
| Survey | When it falls | What the thickness measurement usually covers |
|---|---|---|
| Annual survey | Every year, within three months of the anniversary date | General examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey. |
| Intermediate survey | In place of the second or third annual survey | Suspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age. |
| Renewal survey No. 1 | Around 5 years | The first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal. |
| Renewal survey No. 2 | Around 10 years | Wider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey. |
| Renewal survey No. 3 | Around 15 years | Extensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal. |
| Renewal survey No. 4 and later | Around 20 and 25 years | Gauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme. |
| Docking survey | Twice in each five-year period | Bottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged. |
Flag, port state control and emissions context in Malta
Malta is a member of both the Paris MoU and the Mediterranean MoU, and as an EU state applies the EU port state control regime to foreign ships in its ports. For Malta-flagged ships the flag state relies on recognised organisations for statutory surveys, and the class society concerned sets the thickness measurement requirements for each survey under IACS UR Z7 and, for ESP ships, the UR Z10 series. Under UR Z17 those measurements must be taken by a firm holding approval from that society, so managers confirm the approval position for the ship's class before booking any gauging that will be credited to a survey.
Malta's waters have been inside the Mediterranean SOx ECA since 1 May 2025, so the island's bunker suppliers now serve ships that must burn 0.10% sulphur fuel in the central Mediterranean unless they carry a scrubber delivering the equivalent. Ships that rely on scrubbers run them throughout these waters, and their wash-water and overboard piping is a frequent target when ships stop for bunkers. EU ETS, which has covered shipping since 2024, and FuelEU Maritime, since 2025, apply to Malta port calls and are followed closely by the island's ship managers, including those running tanker and bulk carrier fleets, where steel condition shapes the decision to keep or sell a ship.
Since 1 May 2025 the whole Mediterranean has been a sulphur emission control area, so ships calling at Malta burn 0.10% sulphur fuel or run a scrubber. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service and are worth adding to the gauging scope at every docking.
Typical thickness gauging jobs in Malta
Malta jobs range from full docking programmes at Grand Harbour to a few hours on a ship at anchor between bunkering and sailing. What they share is the island's central position: ships come to Malta for fuel, repair or transhipment, and a superintendent can use that stop for gauging without adding a port call. We plan each job around the docking, the cargo window or the bunkering schedule.
- Renewal survey gauging on a bulk carrier in a Grand Harbour drydock, covering cargo hold and ballast tank structure for its third renewal survey under the ESP regime
- CAP thickness measurement support on an older tanker at the shipyard, gauging cargo and ballast tanks after gas-freeing ahead of the owner's CAP inspection
- Wall-thickness survey of a cruise ship's scrubber discharge lines and shell outlets during a refurbishment at Palumbo Malta Shipyard, with the outlets gauged while the ship is dry
- Off-hire condition gauging on a tanker at anchor off Malta while it bunkers, documenting deck and accessible ballast tank condition at the end of a charter
- Ballast tank and hatch cover gauging on a container ship during a transhipment call at the Malta Freeport, closing out items from its last annual survey
How a thickness measurement job runs at Malta
A gauging job at Malta runs the same way whatever the ship type. The sequence below is what the superintendent, the attending surveyor and the yard can expect from us.
Malta International Airport at Luqa has direct European connections and lies close to both Grand Harbour and Marsaxlokk, so equipment reaches either port quickly by road. The shipyard and the terminals require ISPS passes arranged through the agent or the yard, and the agent books launches for ships at anchor, subject to weather. Malta belongs to the Schengen area, and the team from India enters on Schengen visas. Shipyard dockings are planned well in advance, which suits visa timing; anchorage work tied to a bunkering stop is best raised as soon as the ship's voyage plan includes Malta.
- Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
- We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
- Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
- Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
- Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
- The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.
Who does the work, and when class approval applies
Atlantis mobilises its inspection team from India to the vessel, for each job. There is no office or agent at the port; the team travels to the ship, which is why the planning step comes first. Work is planned and supervised by our Responsible NDT Level III, the founder, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has more than eleven years of international field experience. Technicians are qualified and certified under the company's written practice to ASNT SNT-TC-1A, and Atlantis is certified to ISO 9001 and ISO 14001.
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Governing codes and standards
- IACS UR Z7 hull classification surveys
- IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
- IACS UR Z17 approval of service suppliers
- SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
- MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
- The rules of the vessel's classification society
What you receive
- Thickness measurement report on the class formats, with sketches
- Summary of substantial and excessive corrosion against allowable margins
- Pitting and grooving records with depth and extent
- Piping wall-thickness tables with isometric sketches
- Magnetic particle or penetrant crack-detection reports
- Gauge calibration records and technician certificates
Industries served
- Container ships
- Crude and product tankers
- Bulk carriers
- Cruise ships
- Ro-pax ferries
- Offshore support vessels
- General cargo ships
Frequently asked questions
Can you gauge a ship at anchor off Malta during bunkering?
Yes, when the weather allows safe boarding with equipment. Deck plating, deck piping and any tank the crew makes safe for entry can be measured while the ship bunkers or waits for orders. The offshore areas are exposed, so we keep the plan flexible and agree priorities with the superintendent in case the window shortens.
Is a Malta-flag ship gauged differently from other ships?
No. The flag does not change the measurement work: the classification society acting as the ship's recognised organisation sets the thickness measurement requirements for each survey under the IACS rules. What the Malta flag does mean is that the manager, the yard and the attending surveyor are often all on the island during a Grand Harbour docking, which keeps scoping decisions quick.
Can ship inspection in Malta be combined with work in Sicily or southern Italy?
Often, yes. Sicily is a short flight or ferry crossing away, and a Schengen visa covers both Malta and Italy. If an owner has a docking in Malta and another fleet ship calling in Sicily or at Naples, we can sequence both jobs within one mobilisation and report them separately.
When should we book gauging for a Grand Harbour drydock?
As soon as the docking slot is confirmed. That gives time for visas and lets us plan the gauging sequence with the yard, so that readings are taken before blasting and in time for steel renewal decisions. For CAP or renewal surveys on ESP ships, early booking also allows the tank programme to be agreed with the surveyor in advance.
Does thickness measurement at Malta need class approval?
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Planning a survey or a drydock?
Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Request a QuoteRequest a ship gauging quote
Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Speak to an ASNT NDT Level III
Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.