Maritime inspection · Germany

Thickness Gauging for Ro-Pax Ferries, Cruise Ships and Canal Traffic in Kiel

Kiel's waterfront is built around passenger ships: ro-pax ferries to Norway, Sweden and Lithuania sail from quays close to the city centre, cruise ships turn around at the Ostseekai, and the Kiel Canal's eastern locks at Holtenau bring a steady stream of Baltic traders. Superintendents ask for gauging that fits a ferry's port day or a short canal stop, and for checks on fire main and sea water piping. For each job in Kiel we mobilise a team from India.

Ferry port days, not idle days

Ro-pax ferries on the Oslo, Gothenburg and Klaipėda routes spend their port day loading and discharging. Engine-room piping, voids and tanks that can be opened are gauged during that day; hull structure waits for the refit.

Kiel Canal gauging at Holtenau

Ships transiting between the North Sea and the Baltic pass the Holtenau locks, and some stop at Kiel for bunkers, stores or crew. A planned stop can carry deck, piping or ice-belt readings.

Fire main and sea water lines

On passenger ships, fire main, sea water cooling and ballast lines are examined closely by flag and port state inspectors. Wall-thickness surveys of those systems, with wastage mapped against minimum thickness, suit a ferry's turnaround.

Inspection services for ships at Kiel

Each service has its own page with the method, the class requirements and what the report contains.

Ultrasonic Thickness Measurement (UTM)

Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.

Explore

Special Survey Thickness Measurement

Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.

Explore

CAS (Condition Assessment Scheme)

Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.

Explore

CAP Thickness Measurement

Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.

Explore

ESP Gauging

Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.

Explore

Hull Structural Integrity

Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.

Explore

Ship Piping Inspection

Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.

Explore

Scrubber Piping Inspection

EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.

Explore

IHM (Inventory of Hazardous Materials)

IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.

Explore

Marine NDT Services

Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.

Explore

Kiel: ferries, cruise ships and the canal

Kiel lies at the head of the Kiel Fjord on Germany's Baltic coast, with the Port of Kiel operating terminals on both shores. The traffic is passenger-led. Ro-pax ferries run to Oslo from the Norwegenkai, to Gothenburg from the Schwedenkai and to Klaipėda from the Ostuferhafen, which also handles ro-ro freight. The Ostseekai and other cruise berths make Kiel one of the main Baltic cruise ports in the summer season. At the northern edge of the city, the Holtenau locks mark the eastern end of the Kiel Canal, the shortcut between the North Sea and the Baltic that spares ships the passage round Denmark.

None of these ships is idle for long. A ferry on the Oslo or Gothenburg route arrives in the morning and sails again later the same day, every day, and the port day is filled with discharge, loading, stores and maintenance. Cruise ships turn around in a single day. Canal traffic, made up of feeders, short-sea cargo ships, small tankers and Baltic traders, passes through the locks with only brief waits unless a ship has arranged to stop at Kiel. The longest stays are ferries during lay-up or off-hire periods, and ships waiting for a canal slot or for orders.

That rhythm decides the inspection demand. Passenger ships are surveyed rigorously, and flag administrations and port state inspectors look hard at fire main, sea water and bilge systems, so ferry operators want wall-thickness data on those systems between dockings. Hull structure on ro-pax ships, meaning car decks, ramps, the surroundings of bow and stern doors, and shell plating in way of the ice belt on ice-classed ships, is gauged mainly at refits, but pre-refit gauging in Kiel lets the yard plan the steel. Canal traffic adds short, targeted jobs on ships whose superintendents need a reading before the next port.

Where gauging fits around Kiel's quays and the canal

The ferry terminals in the city are the main workplaces. On a ro-pax port day the team works through spaces the crew can release while cargo operations continue, such as engine-room and pump-room piping, sea water inlet lines, void spaces, and ballast or fresh water tanks that can be emptied, and stops when the ship prepares to sail. Larger hull programmes are scoped for the refit, with gauging in Kiel used to prepare the steel estimate. The Ostuferhafen's ferry and ro-ro berths, used by Baltic freight and the Klaipėda service, give longer quay time than the passenger terminals and suit car-deck and ramp gauging.

Cruise berths at the Ostseekai and elsewhere in the fjord give even tighter windows, usually confined to specific systems the technical team has flagged. At Holtenau, ships waiting for the locks or stopping at the canal-side quays can take small, planned jobs, arranged through the agent around the canal's traffic schedule. Off-hire and laid-up ships at quays in the inner fjord are the best opportunities for full deck, tank and hull gauging, because nothing else competes for the crew's time.

  • Norwegenkai and Schwedenkai ferry terminals — engine-room piping, fire main, void and tank gauging on ro-pax ferries during their daily port stay.
  • Ostuferhafen ferry and ro-ro berths — car-deck, ramp and main-deck gauging on Baltic ro-pax and freight ships with longer quay time.
  • Ostseekai cruise terminal — narrowly scoped piping and tank wall-thickness checks on cruise ships during turnaround.
  • Holtenau locks and canal-side quays — short, pre-planned deck, piping or ice-belt gauging on ships stopping during a Kiel Canal transit.
  • Inner fjord lay-by quays — full deck, tank and hull gauging on laid-up or off-hire ferries and cargo ships.

Thickness measurement through the survey cycle at Kiel

Every renewal survey asks for more thickness measurement than the last, and for oil tankers, chemical tankers and bulk carriers the ESP Code adds close-up survey on top. The table is the usual shape of the work; the class rules and the surveyor set the exact extent, which is why the measurement plan for a job at Kiel is agreed in writing before mobilisation.

SurveyWhen it fallsWhat the thickness measurement usually covers
Annual surveyEvery year, within three months of the anniversary dateGeneral examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey.
Intermediate surveyIn place of the second or third annual surveySuspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age.
Renewal survey No. 1Around 5 yearsThe first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal.
Renewal survey No. 2Around 10 yearsWider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey.
Renewal survey No. 3Around 15 yearsExtensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal.
Renewal survey No. 4 and laterAround 20 and 25 yearsGauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme.
Docking surveyTwice in each five-year periodBottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged.

Baltic rules, ice class and passenger-ship oversight at Kiel

Kiel lies inside the Baltic Sea SOx ECA, and ships transiting the Kiel Canal move straight from one ECA to the other, since the North Sea is one too, so the 0.10% sulphur limit applies the whole way. Ferry operators on Kiel routes have met it with scrubbers, compliant fuels and alternative fuels, and the scrubber wash-water and overboard lines on older ferries are known wastage points. German port state control works under the Paris MoU, and passenger ships calling here are inspected with that regime's attention to fire safety and emergency systems.

Many ships trading through Kiel into the Baltic carry Finnish-Swedish ice class, because ports in the northern Baltic require it in winter. Ice-belt plating takes abrasion and impact that ordinary shell plating does not, and its frames and stringers are worth gauging before the ice season. Passenger ships add EU ro-pax inspection rules and close flag oversight to the usual class cycle. With emissions trading extended to ships in 2024 and FuelEU Maritime targets running from 2025, ferry operators are weighing older tonnage against new, lower-emission ships.

Ships trading to Kiel are inside a sulphur emission control area, where fuel must not exceed 0.10% sulphur unless an exhaust gas cleaning system (scrubber) is fitted. Scrubber wash-water piping, the overboard discharge and the hull penetration around it are among the fastest-corroding parts of a modern ship, so they belong in the gauging scope at every docking and, on open-loop systems, between dockings.

Typical UTM scopes in Kiel and at Holtenau

Kiel jobs have to fit schedules that are fixed weeks in advance: a ferry's daily rotation, a cruise ship's turnaround or a ship's canal transit. Ferry thickness measurement gives the best results when a short list of priority spaces is agreed with the chief engineer before arrival and the crew releases each space as the port day goes on. For refits, the work moves to the yard and follows the TM plan. Examples:

  • A ro-pax ferry on the Oslo route during its port day: fire main and sea water cooling line wall-thickness survey in the engine room, reported before departure.
  • A Gothenburg-route ferry ahead of its annual refit: car-deck plating, ramp and bow-door surround readings taken in Kiel to prepare the yard's steel list.
  • An ice-class Baltic trader stopping at Kiel during a canal transit: ice-belt plating and frame gauging from inside the wing tanks ahead of the winter season.
  • A cruise ship turning around at the Ostseekai: ballast and grey-water piping checks in specific sections the technical team has flagged.
  • A laid-up ferry at an inner fjord quay: full deck, tank and hull gauging to support a sale or a return to service.

How a thickness measurement job runs at Kiel

Most of the work on a Kiel job happens before the team boards: scope, plan and access are settled first, so the time on board goes on measurement.

Hamburg Airport is the usual international arrival point for Kiel, with road and rail links north to the city. Ferry terminals, cruise berths and canal quays are ISPS-controlled, and the agent arranges passes and, for passenger ships, aligns the team's boarding with the ship's security plan. Germany is a Schengen state, so the technicians from India need Schengen visas; ferry and cruise schedules are published well ahead, which makes it easy to fix a mobilisation date early and avoid last-minute changes.

  • Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
  • We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
  • Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
  • Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
  • Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
  • The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.

Who does the work, and when class approval applies

The inspection team is mobilised from India for each job; nobody is stationed at the port, so mobilisation is planned against the vessel's schedule and visa lead times. Our founder and Responsible NDT Level III, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has over eleven years of international field experience, plans and supervises the work. Technicians are certified under the company's written practice to ASNT SNT-TC-1A, and the company holds ISO 9001 and ISO 14001 certification.

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Governing codes and standards

  • IACS UR Z7 hull classification surveys
  • IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
  • IACS UR Z17 approval of service suppliers
  • SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
  • MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
  • The rules of the vessel's classification society

What you receive

  • Thickness measurement report on the class formats, with sketches
  • Summary of substantial and excessive corrosion against allowable margins
  • Pitting and grooving records with depth and extent
  • Piping wall-thickness tables with isometric sketches
  • Magnetic particle or penetrant crack-detection reports
  • Gauge calibration records and technician certificates

Industries served

  • Ro-pax ferries
  • Cruise ships
  • Ro-ro cargo ships
  • Feeder container ships
  • Short-sea and Baltic cargo ships
  • Small product and chemical tankers

Frequently asked questions

Can you gauge a ferry without taking it out of service?

Partly. During a Kiel port day we can measure piping systems, voids, accessible tanks and some structure that the crew can release while cargo operations go on, which keeps the ferry on schedule. Main hull, car-deck and ramp programmes for a class renewal survey need the refit period, when the ship is out of service and staging is available.

Can a ship stop at Kiel during a canal transit for gauging?

Yes, if the stop is arranged through the agent with the canal schedule in mind. A planned stop of a few hours at a Kiel or Holtenau quay suits a defined scope: deck plating, a set of tanks, piping in the engine room or ice-belt readings. Larger scopes are better planned for a longer port call.

Which piping systems are checked most often on ferries?

Fire main, sea water cooling, ballast and bilge lines are the usual candidates, along with scrubber wash-water and overboard lines where fitted. Readings are taken at bends, reducers, downstream of valves and where lines pass through tanks or decks, the places where erosion and corrosion concentrate, and compared with the minimum thickness for each line.

What should be ready on board before the team arrives?

A list of priority spaces and systems, isolation and permit arrangements for each, access and lighting, and the ship's TM plan or piping drawings. On a ferry, the chief engineer's release schedule for the port day is the key document. With that in hand, the team can start as soon as the gangway is secured.

Does thickness measurement at Kiel need class approval?

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Planning a survey or a drydock?

Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.

Request a Quote

Request a ship gauging quote

Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.








Speak to an ASNT NDT Level III

Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.