Maritime inspection · United Kingdom

Ship Gauging at Harwich: Ferries, Wind-Farm Vessels and Harbour Craft

Harwich is the quieter, more varied side of the Stour and Orwell estuary: a ferry port, a Navyard base for pilot and buoy-tending craft, and a staging point for vessels serving North Sea wind farms. Many of these ships work to fixed schedules and lie alongside between duties, which is when hull, tank and piping gauging fits. Atlantis sends technicians from India to the vessel for each job and reports readings in the class TM formats.

Ferry gauging around sailing times

A ro-pax ferry on the Hook of Holland route is alongside for a fixed turnaround. We plan vehicle-deck, ramp, void-space and piping readings so they fit that gap and can be continued over several consecutive calls.

Service fleets between duties

Crew transfer craft, service operation vessels, pilot cutters and buoy tenders have lay days between rosters. Those lay days allow tank, shell and thruster-area gauging without disturbing the work programme.

Dredgers on the Haven channel

Dredging the shared deep-water channel keeps hopper dredgers busy here. Their hoppers, suction pipes and wear plates wear fast, so gauging records show owners which areas to renew at the next docking.

Inspection services for ships at Harwich

Each service has its own page with the method, the class requirements and what the report contains.

Ultrasonic Thickness Measurement (UTM)

Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.

Explore

Special Survey Thickness Measurement

Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.

Explore

CAS (Condition Assessment Scheme)

Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.

Explore

CAP Thickness Measurement

Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.

Explore

ESP Gauging

Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.

Explore

Hull Structural Integrity

Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.

Explore

Ship Piping Inspection

Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.

Explore

Scrubber Piping Inspection

EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.

Explore

IHM (Inventory of Hazardous Materials)

IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.

Explore

Marine NDT Services

Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.

Explore

Harwich: ferry quays, the Navyard and the Haven approaches

Harwich sits on the Essex shore at the point where the rivers Stour and Orwell meet and reach the North Sea. The Harwich Haven Authority looks after the approaches and the deep-water channel, and the dredging needed to keep that channel open to the largest container ships across the water at Felixstowe is a constant source of work for hopper dredgers and their support craft. The port is compact: the old town and the Navyard lie on the point itself, while the large modern ferry terminal stands further up the estuary at Parkeston, with road and rail connections inland.

The traffic is more mixed than at its neighbour. Ro-pax ferries run the overnight crossing to the Hook of Holland and carry freight trailers and passengers on a fixed timetable. Ro-ro freight ships and small general cargo vessels use the quays too. The Navyard is a base for Trinity House vessels, pilot boats and buoy tenders, and Harwich has also developed as a service port for North Sea offshore wind, with crew transfer vessels and larger service operation vessels working from the estuary to arrays off the East Anglian coast. Fishing boats, tugs, sail-training craft and visiting yachts use the harbour as well.

For gauging, this variety matters. The ferries are the largest ships and the ones with the most predictable rhythm, but the workboat fleets are the ones that actually spend the most time idle between jobs. Aluminium and steel crew boats, steel service vessels and ageing tugs all benefit from baseline thickness records, especially where fatigue and corrosion meet at engine beds, thruster tunnels and ballast spaces. Because the Haven is sheltered from most directions except the east and north-east, work alongside is seldom disturbed by the weather, though strong easterlies can stop launch work at the anchorage.

Where gauging happens in Harwich and the Haven

Most work is alongside. A ferry at its berth offers a defined window, so we agree the programme with the superintendent weeks ahead and split it across several turnarounds if the ship's schedule allows. Vehicle decks are clear for a short time after unloading, ramps and hoistable decks can be read when parked, and void spaces and tanks are opened by the crew in the order we agree. For workboats at the Navyard or at smaller quays, the ship is usually in harbour for a day or more, which is long enough for a fuller tank scope.

Harwich has no large commercial drydock of its own, so ships needing a full renewal survey normally dock at yards elsewhere in the UK or across the North Sea in the Netherlands and Belgium. Readings taken here are used to prepare the steel estimate and the docking specification. At the Haven anchorages, boarding by launch is possible when sea state allows, and suits short deck, hatch and air-pipe scopes on vessels waiting for orders or a berth.

  • Ferry berths at the international terminal: vehicle-deck plating, ramps, hoistable decks and sea-water piping between sailings.
  • Navyard quays: tank, shell and deck gauging on pilot boats, buoy tenders and other harbour service craft.
  • Wind-farm service berths: crew transfer vessels and service operation vessels read during rotational lay days.
  • Dredger berths in the estuary: hopper, suction-pipe and wear-plate readings between dredging campaigns.
  • Haven anchorages: short launch-borne scopes on ships waiting for orders, weather or a berth.

Thickness measurement through the survey cycle at Harwich

How much steel has to be gauged depends on which survey the ship is due for, its type and its age. The pattern below is the usual one under IACS unified requirements; the attending surveyor and the class rules for the ship decide the final extent. For a ship calling at Harwich, we agree the programme with the class and the owner before the team mobilises.

SurveyWhen it fallsWhat the thickness measurement usually covers
Annual surveyEvery year, within three months of the anniversary dateGeneral examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey.
Intermediate surveyIn place of the second or third annual surveySuspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age.
Renewal survey No. 1Around 5 yearsThe first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal.
Renewal survey No. 2Around 10 yearsWider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey.
Renewal survey No. 3Around 15 yearsExtensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal.
Renewal survey No. 4 and laterAround 20 and 25 yearsGauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme.
Docking surveyTwice in each five-year periodBottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged.

Port state control, the Haven authority and what drives inspection here

Port state control at Harwich is the responsibility of the Maritime and Coastguard Agency, and the UK has applied Paris MoU practice under its own legislation since leaving the EU. Ro-pax ferries come under both flag-state surveys and the specific passenger-ship inspection regime, so structural condition, watertight integrity and piping all feature in what inspectors look at. Vessels under UK flag in the workboat classes are surveyed under domestic codes rather than as full SOLAS ships, which makes class or administration records of hull thickness an important part of the file.

Offshore wind charterers expect well-documented vessels. Their contractors audit the technical condition of service vessels before and during contracts, and structural thickness records, along with evidence of corrosion control in ballast and fuel spaces, strengthen the owner's position at tender. Ferry operators face a similar discipline, with older tonnage kept in service by close monitoring of known wastage areas. Gauging at Harwich therefore serves owners who need to document condition for a charterer, a buyer or an insurer as much as those preparing for a class docking.

Ships trading to Harwich are inside a sulphur emission control area, where fuel must not exceed 0.10% sulphur unless an exhaust gas cleaning system (scrubber) is fitted. Scrubber wash-water piping, the overboard discharge and the hull penetration around it are among the fastest-corroding parts of a modern ship, so they belong in the gauging scope at every docking and, on open-loop systems, between dockings.

Typical thickness gauging jobs at Harwich

The work at Harwich splits between schedule-driven ferry calls and flexible workboat jobs. We plan ferry work around the turnaround and the crew's staffing, and workboat work around lay days and the contract calendar. In both cases the superintendent receives readings in the class layout, with any areas close to the allowable diminution marked for the docking estimate.

  • Vehicle-deck plating, ramp hinge and hoistable-deck gauging on a ro-pax ferry across consecutive turnarounds, with MPI on fatigue-prone lugs.
  • Ballast and fuel tank gauging on a service operation vessel between offshore wind rotations.
  • Shell, thruster-tunnel and tank readings on a crew transfer vessel hauled out or lying at a repair berth.
  • Hopper, suction-pipe and wear-plate gauging on a dredger working the Haven channel.
  • Pre-purchase condition gauging on a tug, pilot boat or small coastal tanker lying in the estuary.

How a thickness measurement job runs at Harwich

A gauging job at Harwich runs the same way whatever the ship type. The sequence below is what the superintendent, the attending surveyor and the yard can expect from us.

Stansted is the closest major airport, with Heathrow and Gatwick reached by rail or road; from Stansted the road or rail route to Harwich passes through Colchester or Manningtree. Harwich International and the Navyard control access with passes issued through the shipping line or the vessel's agent. Technicians travel from India on UK visas, applied for once the job is confirmed, and owners with regular calls benefit from valid visas already in place. Launches for the Haven anchorages are booked by the ship's agent.

  • Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
  • We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
  • Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
  • Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
  • Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
  • The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.

Who does the work, and when class approval applies

Atlantis mobilises its inspection team from India to the vessel, for each job. There is no office or agent at the port; the team travels to the ship, which is why the planning step comes first. Work is planned and supervised by our Responsible NDT Level III, the founder, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has more than eleven years of international field experience. Technicians are qualified and certified under the company's written practice to ASNT SNT-TC-1A, and Atlantis is certified to ISO 9001 and ISO 14001.

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Governing codes and standards

  • IACS UR Z7 hull classification surveys
  • IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
  • IACS UR Z17 approval of service suppliers
  • SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
  • MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
  • The rules of the vessel's classification society

What you receive

  • Thickness measurement report on the class formats, with sketches
  • Summary of substantial and excessive corrosion against allowable margins
  • Pitting and grooving records with depth and extent
  • Piping wall-thickness tables with isometric sketches
  • Magnetic particle or penetrant crack-detection reports
  • Gauge calibration records and technician certificates

Industries served

  • Ro-pax ferries
  • Ro-ro freight ships
  • Crew transfer vessels
  • Service operation vessels
  • Pilot boats and buoy tenders
  • Hopper and suction dredgers
  • Tugs and harbour craft
  • Coastal tankers and cargo ships

Frequently asked questions

Can a ferry be gauged between sailings at Harwich?

Yes, for a defined scope. A ro-pax ferry on a fixed rotation is alongside for a limited time, so we agree the sequence in advance and split larger programmes across several turnarounds. Vehicle decks are read when clear, ramps when parked, and tanks and voids only once the crew confirm gas-free status and the enclosed-space permit is in place.

Do you gauge offshore wind support vessels at Harwich?

We do, for owners and managers of crew transfer and service operation vessels. Lay days between rotations are used for tank, shell and thruster-area gauging, and the readings can support a charterer's audit or a docking estimate. We coordinate the schedule with the operator's marine team so that the vessel is not taken off a contract day.

Is there a drydock at Harwich for steel renewal?

Not for commercial ships of any size. Owners usually dock at a yard elsewhere in the UK or across the North Sea. We use the Harwich readings to produce the steel estimate for that yard and to agree the renewal list with class before the ship arrives, which shortens the docking period.

Can gauging be arranged at the Haven anchorages?

Yes, by launch, when the sea state allows safe boarding. The realistic scope is deck plating, hatch covers and air pipes, plus any tank the crew has prepared. Strong easterlies can close the window, so the most important readings are done first. For anything larger, the berth is the better option.

How do you organise a Harwich job with a team coming from India?

The superintendent confirms the ship's dates and scope, we apply for UK visas, book flights to the London airports and arrange onward travel to Harwich. The agent or the shipping line arranges port passes. When a ferry's rotation is known weeks ahead, we plan visits in sequence, so the work continues across turnarounds without repeated mobilisation.

Does thickness measurement at Harwich need class approval?

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Planning a survey or a drydock?

Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.

Request a Quote

Request a ship gauging quote

Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.








Speak to an ASNT NDT Level III

Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.