Maritime inspection · Norway
Thickness Measurement at Hammerfest for LNG Carriers, Offshore Supply Ships and the Barents Sea Fleet
Hammerfest, on the island of Kvaløya in western Finnmark, is the onshore base for oil and gas in the Barents Sea. LNG carriers load at the Hammerfest LNG plant on Melkøya, supply vessels sail from the town's bases to the Goliat and Johan Castberg fields and to drilling rigs, and fishing vessels land at the harbour. Gauging fits between supply runs, inside terminal windows or during crew changes, and it is carried out by technicians who travel from India to the ship for each job.
LNG carriers at Melkøya
Carriers loading at the Hammerfest LNG plant work inside the terminal's strict gas-safety regime. With permits, ballast tanks, double-bottom spaces and deck structure clear of hazardous zones can be gauged, while the cargo containment system is left for the docking yard.
Supply runs into the Barents Sea
Platform supply vessels serving Goliat, Johan Castberg and exploration rigs make long round trips in harsh water. Mud, brine and fuel tanks, cargo rails and deck plating take a beating, and crew-change stops in Hammerfest give time to measure them.
Winter work in western Finnmark
Snow showers, polar lows and freezing spray make winter the hardest season here. Tank and machinery-space gauging carries on regardless, but deck and hatch readings are fitted around the weather and the short midday twilight of the polar night.
Inspection services for ships at Hammerfest
Each service has its own page with the method, the class requirements and what the report contains.
Ultrasonic Thickness Measurement (UTM)
Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.
ExploreSpecial Survey Thickness Measurement
Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.
ExploreCAS (Condition Assessment Scheme)
Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.
ExploreCAP Thickness Measurement
Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.
ExploreESP Gauging
Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.
ExploreHull Structural Integrity
Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.
ExploreShip Piping Inspection
Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.
ExploreScrubber Piping Inspection
EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.
ExploreIHM (Inventory of Hazardous Materials)
IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.
ExploreMarine NDT Services
Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.
ExploreHammerfest: Barents Sea energy and a fishing harbour
Hammerfest lies on the western side of Kvaløya, facing the sounds that lead out to the open Barents Sea, and has been a trading and fishing port for centuries. Its modern role began with the Snøhvit gas field: gas is piped from the subsea field to Melkøya, a small island across the harbour, where Equinor's Hammerfest LNG plant liquefies it for export by sea. The oil fields that followed, Goliat and later Johan Castberg, both draw on Hammerfest for their supply logistics, and the town has become the northern hub for offshore activity on the Norwegian continental shelf. Exploration drilling in the Barents Sea is supported from the same bases. The plant and the bases have given the town a year-round industrial workforce and services that many Finnmark harbours lack.
Traffic falls into three groups. LNG carriers call at Melkøya to load cargoes for Europe and other markets. Offshore vessels, platform supply ships, standby and emergency response vessels, and ships supporting drilling rigs work from the supply bases in the town, of which Polarbase is the longest established. The third group is the fishing and coastal fleet: trawlers and coastal boats land at the harbour's fish plants, the coastal express calls daily in both directions, cargo ships bring supplies to Finnmark, and cruise ships visit in summer. Hammerfest is small, but on a busy day all three groups are in port at once. Supply vessels change crews at the bases between trips, and those changeovers set much of the quayside rhythm.
Weather sets the pace. Hammerfest is far north of the Arctic Circle, with weeks of polar night around midwinter and midnight sun in summer, and the Barents Sea brings sudden polar lows, heavy snow showers and freezing spray in the cold months. The harbour itself stays ice-free, but icing on decks, railings and ladders is a real hazard for anyone working on open deck in winter. Supply vessels regularly shelter or delay sailings in bad weather, and those delays, unwelcome to the logistics planners, are often the most useful gauging windows of the year. Open-deck work is easiest in summer, when the midnight sun allows round-the-clock shifts, while autumn storms can arrive early and spring light returns faster than the cold retreats.
Where ships are gauged at Hammerfest
The supply bases are where offshore vessels spend their time in port, loading deck cargo, drilling fluids, fuel and water between trips. Gauging on board is planned with the vessel operator around the loading programme: deck plating and cargo rails while cargo is lifted elsewhere on deck, engine-room piping at any time, and tanks once they have been emptied and cleaned. The bases handle drilling-fluid bulk and waste reception, which makes tank preparation possible within a normal port stay, especially when a crew change or a weather hold stretches it.
At Melkøya the LNG terminal sets the rules. Any work on a carrier at the jetty is agreed in advance with the terminal and the ship, uses equipment the terminal accepts, and is confined to spaces outside the cargo containment system: ballast tanks, voids, deck structure away from hazardous areas and the engine room. Hammerfest has no dry dock for large ships. Fishing vessels and workboats use slipway yards elsewhere in Finnmark and Troms, while offshore vessels and LNG carriers dock at larger yards further south or abroad, and readings taken in Hammerfest feed their steel estimates.
- Offshore supply bases — tank, deck, cargo-rail and piping gauging on PSVs and standby vessels between Barents Sea trips.
- Melkøya LNG jetty — ballast tank, void and deck gauging on LNG carriers within terminal permits, cargo containment excluded.
- Town harbour and fish plant quays — fish-hold and hull readings on trawlers and coastal fishing vessels after landing.
- Coastal express and cargo quays — short machinery-space and deck checks during scheduled calls.
- Berths used during weather holds — fuller tank programmes on offshore vessels kept in port by Barents Sea storms.
Thickness measurement through the survey cycle at Hammerfest
How much steel has to be gauged depends on which survey the ship is due for, its type and its age. The pattern below is the usual one under IACS unified requirements; the attending surveyor and the class rules for the ship decide the final extent. For a ship calling at Hammerfest, we agree the programme with the class and the owner before the team mobilises.
| Survey | When it falls | What the thickness measurement usually covers |
|---|---|---|
| Annual survey | Every year, within three months of the anniversary date | General examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey. |
| Intermediate survey | In place of the second or third annual survey | Suspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age. |
| Renewal survey No. 1 | Around 5 years | The first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal. |
| Renewal survey No. 2 | Around 10 years | Wider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey. |
| Renewal survey No. 3 | Around 15 years | Extensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal. |
| Renewal survey No. 4 and later | Around 20 and 25 years | Gauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme. |
| Docking survey | Twice in each five-year period | Bottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged. |
Petroleum regulation, gas terminals and Arctic conditions at Hammerfest
Petroleum activity in the Barents Sea falls under Havtil, the Norwegian Ocean Industry Authority, and vessels serving the installations meet the field operators' own requirements on top of class and flag. Foreign ships, most LNG carriers among them, are subject to Paris MoU port state control by the Norwegian Maritime Authority, and ship traffic along the northern coast is watched from the vessel traffic service centre at Vardø. LNG carriers are also vetted by their charterers and screened by the terminal, so a ship with documented ballast tank and hull condition faces fewer surprises when inspectors and vetting officers come aboard.
The Arctic climate leaves its own marks on steel. Ice on decks and railings is cleared by hand, and the scraping and hammering involved chips coatings and starts corrosion at deck fittings, railing stanchions and hatch edges. Winterisation adds heat-traced pipes, covered walkways and enclosed deck areas, under which wastage can go unnoticed until someone measures it. Supply vessels that have moved north from North Sea work can therefore develop corrosion in places their owners are not used to checking, and a first set of readings after a winter in the Barents Sea is often revealing.
Wherever a ship is outside a sulphur emission control area, the global 0.50% sulphur cap applies, and many of the ships calling at Hammerfest meet it with an exhaust gas cleaning system rather than compliant fuel. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service, especially on open-loop systems, and are worth adding to the gauging scope.
Gauging jobs at Hammerfest
Most Hammerfest jobs are on offshore vessels and are fitted into a port stay of a day or two, with the operator arranging tank cleaning before the team boards. LNG carrier work is less frequent and always pre-agreed with the terminal. Fishing vessels give shorter, simpler scopes between trips. Winter jobs need extra time for weather, and the scope is ordered so that tanks and machinery spaces, unaffected by snow or darkness, carry the plan when deck work has to wait. Reports are issued before the vessel's next sailing where the operator needs them for a contract or a survey. Typical scopes include:
- A PSV kept in Hammerfest by a polar low: liquid-mud, brine and base-oil tanks gauged after cleaning, with deck plating and cargo rails.
- An LNG carrier at Melkøya: ballast tank and double-bottom gauging within the terminal's permit window, ahead of a docking elsewhere.
- A standby vessel between field rotations: waterline shell plating, rescue-zone deck structure and MPI at davit foundations.
- A trawler at a fish plant quay: fish-hold and freezer-room bulkhead readings, with crack detection at gantry foundations.
- Pre-purchase gauging of an older supply vessel being sold out of Barents Sea service.
How a thickness measurement job runs at Hammerfest
Most of the work on a Hammerfest job happens before the team boards: scope, plan and access are settled first, so the time on board goes on measurement.
Hammerfest has a small regional airport with domestic connections, and Alta Airport, with direct flights from Oslo, is within driving distance; the team usually flies to one of the two and continues by road. The supply bases and the Melkøya terminal are ISPS facilities, and the LNG plant applies its own induction and equipment checks, so the operator or the ship's agent submits the team's details well before arrival. Norway is in the Schengen area, and the technicians travel from India on Schengen visas planned against the vessel's schedule.
- Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
- We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
- Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
- Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
- Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
- The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.
Who does the work, and when class approval applies
The inspection team is mobilised from India for each job; nobody is stationed at the port, so mobilisation is planned against the vessel's schedule and visa lead times. Our founder and Responsible NDT Level III, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has over eleven years of international field experience, plans and supervises the work. Technicians are certified under the company's written practice to ASNT SNT-TC-1A, and the company holds ISO 9001 and ISO 14001 certification.
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Governing codes and standards
- IACS UR Z7 hull classification surveys
- IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
- IACS UR Z17 approval of service suppliers
- SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
- MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
- The rules of the vessel's classification society
What you receive
- Thickness measurement report on the class formats, with sketches
- Summary of substantial and excessive corrosion against allowable margins
- Pitting and grooving records with depth and extent
- Piping wall-thickness tables with isometric sketches
- Magnetic particle or penetrant crack-detection reports
- Gauge calibration records and technician certificates
Industries served
- LNG carriers
- Platform supply vessels
- Standby and emergency response vessels
- Anchor-handling and rig support vessels
- Deep-sea trawlers
- Coastal fishing vessels
- Coastal express ships
- Coastal cargo ships
Frequently asked questions
Can you gauge an LNG carrier at Melkøya?
Only within the terminal's and the ship's gas-safety arrangements. In practice that means ballast tanks, double bottom, voids, deck structure clear of hazardous zones and the engine room, using equipment the terminal has accepted. The cargo containment system is never touched at the jetty, and everything is agreed through the agent and the terminal before the ship arrives.
What happens if Barents Sea weather keeps the team from working on deck?
Alongside the bases, weather rarely stops work inside the ship; it is open-deck readings and boat transfers that suffer. We plan winter scopes with tanks and machinery spaces first, keep deck work flexible, and talk to the operator daily so that a weather hold becomes extra gauging time rather than lost time.
Is there a dry dock at Hammerfest?
Not for large ships. Fishing vessels and small workboats are slipped at yards elsewhere in northern Norway, and offshore vessels and LNG carriers dock at yards further south or abroad. Readings taken in Hammerfest before a vessel leaves give the owner an early steel estimate for that docking. Planning that docking scope from Hammerfest saves time once the ship is at the yard.
Which tanks on a supply vessel should be gauged first?
Usually the liquid-mud and brine tanks, because those cargoes attack coatings and then the steel behind them, followed by base-oil, fuel and ballast tanks. Many owners also ask for cargo-rail foundations and deck plating in the cargo area, which take impact damage from containers and baskets. The order is agreed with the operator in light of the vessel's survey history.
Does thickness measurement at Hammerfest need class approval?
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Planning a survey or a drydock?
Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Request a QuoteRequest a ship gauging quote
Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Speak to an ASNT NDT Level III
Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.