Maritime inspection · Netherlands

Thickness Measurement for Offshore Wind and Energy Vessels at Eemshaven

Eemshaven is the energy port at the mouth of the Ems, built on reclaimed land on the Groningen coast and open to the tide without locks. Installation vessels, jack-ups, cable layers and service ships use it as a base for wind farms in Dutch and German waters, gas carriers supply the floating LNG terminal, and a ferry links the port with Borkum. Vessels lie alongside for loading, mobilisation and crew changes, which gives time for gauging. Every job is carried out by technicians who travel out from India to the vessel.

Installation vessels during mobilisation

Jack-ups and heavy-lift ships load turbine components and sea-fastenings at Eemshaven before each campaign. Mobilisation periods open up deck plating, grillage areas, crane pedestals and preload tanks, all of which carry heavy local loads and benefit from gauging and MPI between campaigns.

Service ships for operating wind farms

Service operation vessels and walk-to-work ships based at the port return regularly for crew changes and stores. Gangway and crane foundations, deck structure and ballast tanks can be gauged during those stays, building a running record instead of one large survey.

Cable layers between projects

Subsea power cables come ashore on this stretch of coast, and cable-laying ships prepare for and return from campaigns here. Carousel and tensioner foundations, deck structure and ballast tanks can be measured while a ship waits for its next cable job.

Inspection services for ships at Eemshaven

Each service has its own page with the method, the class requirements and what the report contains.

Ultrasonic Thickness Measurement (UTM)

Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.

Explore

Special Survey Thickness Measurement

Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.

Explore

CAS (Condition Assessment Scheme)

Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.

Explore

CAP Thickness Measurement

Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.

Explore

ESP Gauging

Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.

Explore

Hull Structural Integrity

Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.

Explore

Ship Piping Inspection

Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.

Explore

Scrubber Piping Inspection

EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.

Explore

IHM (Inventory of Hazardous Materials)

IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.

Explore

Marine NDT Services

Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.

Explore

Eemshaven: an energy port on the open Ems

Eemshaven lies at the north-eastern corner of the Netherlands, where the Ems estuary meets the Wadden Sea, a short distance across the water from the German island of Borkum. It is the seaward partner of Delfzijl within Groningen Seaports and the deeper of the two: ships arrive from the North Sea along the Ems fairway and berth in harbour basins open to the tide, with no sea lock to pass. The port was developed on land reclaimed from the Wadden Sea, and its long quays and large open terminal areas suit heavy, bulky cargo. The tidal range and the stream in the outer Ems enter every passage plan, and ships waiting for a berth or for suitable conditions use the anchorages in the Ems approaches.

Energy defines the traffic. Power stations stand on the edge of the port, subsea power cables to Norway and Denmark come ashore here, and since 2022 a floating LNG import terminal has received gas carriers, set up quickly when Europe needed to replace Russian pipeline gas. Above all, Eemshaven has become one of the main ports on this coast for offshore wind: turbine components, foundations and cables are staged on its terminals and loaded onto installation vessels, while service operation vessels and crew transfer vessels work from the port to maintain operating wind farms. Multipurpose and heavy-lift ships deliver components, and AG Ems runs a ferry to Borkum. Many callers are therefore specialised offshore units rather than ordinary cargo ships, working in rough water with heavy loads on deck.

The working pattern follows the construction calendar and the North Sea weather. Installation campaigns concentrate in the months with the best weather windows, so installation vessels often mobilise ahead of the summer and then cycle between port and wind farm, loading new components on each trip. Between campaigns, or when a project ends, a jack-up or heavy-lift ship may lie at the quay for weeks while its deck is reconfigured for the next job. Service vessels keep a steadier rhythm through the year, returning for crew changes on a fixed rotation. For a superintendent, Eemshaven therefore offers both short, repeated port stays and occasional long idle periods, and the gauging plan can use either: a package at each crew change, or a complete programme while the vessel waits.

Quays, terminals and docking options for Eemshaven vessels

Eemshaven is a working port rather than a repair port, and gauging here is done afloat at the quays and terminals. The offshore wind terminals have heavy-load quays where installation vessels and heavy-lift ships load foundations, towers, blades and nacelles. Mobilisation and demobilisation periods, when sea-fastenings are welded on or cut away and equipment is changed, give access to deck areas that are covered by cargo for most of a campaign. Service vessels use their own berths and pontoons, and their port stays are short but frequent, so work on them is planned in packages that each fit one stay.

When a docking is due, Eemshaven vessels go elsewhere. Smaller service and crew vessels can dock at Delfzijl, Harlingen or Den Helder, while large installation vessels and jack-ups need the big docks of yards in Germany, the Netherlands or Denmark, chosen by the owner. Readings taken at Eemshaven before the ship sails let the superintendent go into the docking with a defined steel list and a gauging plan for the remaining spaces. Work on the gas carriers serving the floating LNG terminal is planned with the terminal operator under its gas-safety rules and stays outside the cargo containment.

  • Offshore wind terminals — deck plating, crane pedestals, sea-fastening areas and preload or ballast tanks on installation vessels during mobilisation or demobilisation.
  • Service vessel berths — gangway and crane foundations, deck structure and ballast tanks on service operation and walk-to-work vessels during crew-change stays.
  • Crew transfer vessel pontoons — hull plating, fender zones and weld checks on aluminium and steel crew boats between shifts.
  • Multipurpose and heavy-lift berths — hold, tank-top and hatch cover gauging once components have been discharged.
  • Lay-by quays — longer gauging programmes on jack-ups, cable layers and offshore ships idle between projects.

Thickness measurement through the survey cycle at Eemshaven

How much steel has to be gauged depends on which survey the ship is due for, its type and its age. The pattern below is the usual one under IACS unified requirements; the attending surveyor and the class rules for the ship decide the final extent. For a ship calling at Eemshaven, we agree the programme with the class and the owner before the team mobilises.

SurveyWhen it fallsWhat the thickness measurement usually covers
Annual surveyEvery year, within three months of the anniversary dateGeneral examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey.
Intermediate surveyIn place of the second or third annual surveySuspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age.
Renewal survey No. 1Around 5 yearsThe first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal.
Renewal survey No. 2Around 10 yearsWider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey.
Renewal survey No. 3Around 15 yearsExtensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal.
Renewal survey No. 4 and laterAround 20 and 25 yearsGauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme.
Docking surveyTwice in each five-year periodBottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged.

Offshore audits, emissions rules and conversions at Eemshaven

Port state control at Eemshaven follows the Paris MoU and is carried out by the Human Environment and Transport Inspectorate (ILT). Many of the vessels working wind farms from here are on long-term charters, and wind farm owners and turbine makers apply their own vessel audits, in which structural condition, lifting equipment records and tank inspection history all count. On jack-up installation vessels, class surveys the legs, spudcans and jacking systems in detail, and the hull and deck structure that carries the jacking and preload forces deserves the same attention from the owner's side.

Regulation is tightening around these ships too. The EU ETS has covered larger cargo and passenger ships since 2024 and is due to take in offshore ships of 5,000 GT and above from 2027, which brings in most installation vessels and many service operation vessels. Operators are answering with methanol-capable and battery-hybrid newbuilds, while older vessels are upgraded or converted, and each upgrade puts new equipment on an existing deck. Measuring the existing structure before a conversion, and checking it again after the first seasons of use, is how owners confirm that the hull is carrying its new role safely.

Ships trading to Eemshaven are inside a sulphur emission control area, where fuel must not exceed 0.10% sulphur unless an exhaust gas cleaning system (scrubber) is fitted. Scrubber wash-water piping, the overboard discharge and the hull penetration around it are among the fastest-corroding parts of a modern ship, so they belong in the gauging scope at every docking and, on open-loop systems, between dockings.

Thickness gauging requests at Eemshaven

Jobs at Eemshaven are almost always on offshore and energy vessels, and they are timed to the vessel's campaign rather than a cargo call. An installation vessel's superintendent wants deck and pedestal structure checked while the sea-fastenings are off; a service vessel's technical manager wants the gauging spread over several crew changes so the ship never stays in port longer than planned. When a vessel is heading for a yard, the request is a pre-docking gauging that sets the steel list. Crack detection by MPI on steel, or by dye penetrant on aluminium, is often added to the thickness scope. Typical requests:

  • A jack-up installation vessel demobilising after a turbine campaign: deck plating under the sea-fastening grillage, crane pedestal welds by MPI and preload tank gauging.
  • A service operation vessel on crew change: gangway foundation, crane pedestal and the surrounding deck structure gauged in sections over successive port stays.
  • A heavy-lift ship after discharging foundations: tank-top and hold plating, hatch cover structure and crane foundations measured before the next loading.
  • A cable-laying vessel between projects: carousel foundation, deck and ballast tank gauging while the ship waits at a lay-by quay.
  • A crew transfer vessel: hull plating in the bow fender zone measured, and welded joints in the aluminium structure checked by dye penetrant.

How a thickness measurement job runs at Eemshaven

Most of the work on a Eemshaven job happens before the team boards: scope, plan and access are settled first, so the time on board goes on measurement.

Amsterdam Schiphol is the main international airport, with onward travel by rail to Groningen and by road to Eemshaven; Groningen Airport Eelde and Bremen Airport are alternatives on some routes. The offshore terminals and the LNG terminal operate under ISPS and their own site inductions, which the ship's agent or the terminal arranges before the team arrives. Technicians come from India on Schengen visas, and because offshore campaign dates move with the weather, we keep in touch with the agent and adjust travel to the vessel's confirmed port stay.

  • Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
  • We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
  • Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
  • Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
  • Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
  • The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.

Who does the work, and when class approval applies

The inspection team is mobilised from India for each job; nobody is stationed at the port, so mobilisation is planned against the vessel's schedule and visa lead times. Our founder and Responsible NDT Level III, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has over eleven years of international field experience, plans and supervises the work. Technicians are certified under the company's written practice to ASNT SNT-TC-1A, and the company holds ISO 9001 and ISO 14001 certification.

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Governing codes and standards

  • IACS UR Z7 hull classification surveys
  • IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
  • IACS UR Z17 approval of service suppliers
  • SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
  • MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
  • The rules of the vessel's classification society

What you receive

  • Thickness measurement report on the class formats, with sketches
  • Summary of substantial and excessive corrosion against allowable margins
  • Pitting and grooving records with depth and extent
  • Piping wall-thickness tables with isometric sketches
  • Magnetic particle or penetrant crack-detection reports
  • Gauge calibration records and technician certificates

Industries served

  • Jack-up installation vessels
  • Heavy-lift and multipurpose ships
  • Service operation vessels
  • Walk-to-work vessels
  • Cable-laying vessels
  • Crew transfer vessels
  • LNG carriers
  • Ro-pax ferries

Frequently asked questions

Is there a drydock at Eemshaven?

No. Eemshaven is an offshore, energy and cargo port, and gauging here is done afloat. Smaller vessels dock at nearby yards in Delfzijl or Harlingen, and large installation vessels at bigger yards elsewhere. A pre-docking gauging at Eemshaven before the vessel leaves for the yard gives the superintendent a measured steel list to take into the docking.

Can deck plating be gauged while sea-fastenings are still welded on?

Only around them. Plating directly under grillages and stoppers stays hidden until the fastenings are removed, so the best moment is demobilisation, before new sea-fastenings go on for the next campaign. We agree with the superintendent which areas to measure in that gap and add magnetic particle testing where cracks are suspected at old fastening welds.

How do you gauge a service vessel without extending its port stay?

We split the scope into packages that each fit one crew-change stay, starting with the structure the charterer or class cares about most, such as the gangway and crane foundations. Every package is reported against the same TM plan references, so the readings build into one record. The crew prepares the next spaces in advance, and the vessel sails on schedule.

Does winter weather stop gauging work at Eemshaven?

Wind and cold can slow work on open decks, and some deck readings wait for dry surfaces, but internal tanks and enclosed spaces can be gauged in most conditions once they are ventilated. Winter is also when many installation vessels are idle between campaigns, so it is often the most practical season for a longer programme on board.

Is MPI suitable for crane pedestals on offshore vessels?

Yes, on steel pedestals and their welds to the deck, which is where fatigue cracks tend to start under repeated lifting loads. The surface has to be cleaned and the coating removed or kept thin enough for the test, so preparation is agreed with the crew beforehand. Wall thickness of the pedestal and the deck plating around it is gauged in the same visit.

Does thickness measurement at Eemshaven need class approval?

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Planning a survey or a drydock?

Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.

Request a Quote

Request a ship gauging quote

Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.








Speak to an ASNT NDT Level III

Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.