Maritime inspection · France
Calais Port: Thickness Gauging for Ferries, Ro-Ro Ships and Dredgers
Calais is the busiest passenger and freight crossing on the Dover Strait, with ferries and ro-ro ships running to England all day, every day, plus dredgers and service craft working the sandbanks offshore. These ships rarely stay long, which shapes how they are gauged. Technicians travel from India to Calais and work around the schedule, using overnight berths, lay-ups and planned overhaul periods to measure hull, decks, ramps and piping.
Ferries on short crossings
Cross-Channel ferries spend little time alongside, so gauging uses overnight layovers, scheduled maintenance days and lay-ups. A focused scope of vehicle deck, ramp and piping readings can be completed without disturbing the timetable.
Freight ro-ro in constant rotation
Ro-ro freight ships turn quickly at the Calais terminals. We plan gauging for the longer stays, agreeing with the operator which decks, ramps and tanks are released and when, so the vessel stays on schedule.
Dredgers on the Channel sandbanks
Dredgers and service vessels that work the approaches wear hulls and pipework quickly in sand and salt. Gauging them between campaigns catches thinning in pump and discharge piping before it reaches failure.
Inspection services for ships at Calais
Each service has its own page with the method, the class requirements and what the report contains.
Ultrasonic Thickness Measurement (UTM)
Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.
ExploreSpecial Survey Thickness Measurement
Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.
ExploreCAS (Condition Assessment Scheme)
Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.
ExploreCAP Thickness Measurement
Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.
ExploreESP Gauging
Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.
ExploreHull Structural Integrity
Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.
ExploreShip Piping Inspection
Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.
ExploreScrubber Piping Inspection
EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.
ExploreIHM (Inventory of Hazardous Materials)
IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.
ExploreMarine NDT Services
Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.
ExploreCalais: a short-sea gateway with a deep outer harbour and a lock-gated old port
Calais lies on the narrowest part of the Dover Strait, with the English coast a short crossing away. The Port Boulogne-Calais operation, run by the Société d'exploitation des ports du Détroit under the Hauts-de-France region, covers both Calais and nearby Boulogne-sur-Mer. At Calais the main ferry and freight terminals sit in a large outer harbour, completed in recent years, with open-water access for big ships, while the older inner basins behind the lock are used by smaller vessels, fishing boats and the port's service craft.
Traffic is dominated by ro-pax ferries and freight ro-ro ships. Several operators run frequent services to Dover, with large modern ferries carrying cars, coaches and lorries, and the port also receives cargo ships carrying steel, timber, aggregates and project cargo, though in smaller volumes than the ferry flow. Tugs, pilot boats, dredgers and rescue craft are based in the port and support the heavy traffic and the sandbanks offshore, which need regular dredging to keep channels safe. The English Channel here sees some of the world's densest shipping, and the port's pilots and traffic services are used to managing it.
Time alongside is the factor that governs everything. A ferry's turnround is short and rigid, and a freight ro-ro runs to a similar rhythm, so a team cannot count on hours of uninterrupted access. Overnight layovers, scheduled maintenance days and winter overhaul periods are when substantial gauging can be done. Weather on the Strait can interrupt ferry operation in strong winds, and wind or fog may keep a ship in port longer than planned, which occasionally creates an unplanned window that a team on standby can use with the operator's agreement.
Where ships can be gauged at Calais
Ferry berths are working terminals with loading ramps, passenger access and strict security. Gauging there focuses on what is accessible while the ship is in service: the structure of vehicle decks, ramps and ramp hinges, ballast and fuel tanks that the crew can release, machinery-space piping and the scrubber wash-water lines on ships that carry them. Most ferry owners prefer to carry out major steel work during a planned refit at a yard, and the measurements made at Calais become the basis for the steel scope of that refit.
In the older basins behind the lock, quays take smaller ships for longer stays, and these are the best places for slow, systematic gauging of coasters, dredgers and service craft. The port's repair resources are modest compared with large yards elsewhere on the coast, so ships needing a docking usually go to a bigger facility in another port, and a gauging programme at Calais can be timed to feed straight into that decision. Anchorage in the roads outside the harbour is available to ships waiting for berths or tide.
- Ferry terminal berths — vehicle deck, ramp and piping gauging in the gaps between sailings and during overnight layovers.
- Freight ro-ro terminals — deck, ramp and tank gauging on ships released by the operator for the longer stays.
- Outer harbour quays — hull and deck gauging on cargo ships carrying steel, timber and aggregates.
- Inner basins behind the lock — longer gauging of dredgers, coasters and service craft laid by between jobs.
- Lay-up and overhaul periods — extended access for a full ballast tank and shell programme before a refit elsewhere.
- Roads outside the port — launch-assisted work on ships waiting for berth or tide, in suitable weather.
Thickness measurement through the survey cycle at Calais
Every renewal survey asks for more thickness measurement than the last, and for oil tankers, chemical tankers and bulk carriers the ESP Code adds close-up survey on top. The table is the usual shape of the work; the class rules and the surveyor set the exact extent, which is why the measurement plan for a job at Calais is agreed in writing before mobilisation.
| Survey | When it falls | What the thickness measurement usually covers |
|---|---|---|
| Annual survey | Every year, within three months of the anniversary date | General examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey. |
| Intermediate survey | In place of the second or third annual survey | Suspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age. |
| Renewal survey No. 1 | Around 5 years | The first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal. |
| Renewal survey No. 2 | Around 10 years | Wider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey. |
| Renewal survey No. 3 | Around 15 years | Extensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal. |
| Renewal survey No. 4 and later | Around 20 and 25 years | Gauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme. |
| Docking survey | Twice in each five-year period | Bottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged. |
French port state control and the Dover Strait ferry regime
In France, port state control is carried out by the Centres de sécurité des navires, the ship safety centres of the Affaires maritimes administration, under the Paris MoU. Ferries on regular crossings are also subject to the EU's special survey regime for ro-ro ferries, which brings frequent and detailed inspections, and they are classed ships whose society's rules set the extent of structural gauging. Because Calais ferries run constantly in a corrosive, wet environment, vehicle deck plating, lashing points, ramp structures and drain areas are the details that attract most attention.
Calais lies inside the SECA, so scrubber-fitted ferries and ro-ro ships run their wash-water systems on virtually every crossing. That makes overboard piping a high-wear item, and owners often add it to the gauging scope alongside the deck and tank work. The EU emissions trading scheme and FuelEU Maritime apply to these ships, and the Inventory of Hazardous Materials is required for those over the size threshold, so owners of older ferries also benefit from a steady record of steel condition to support decisions on refit, sale or replacement.
Ships trading to Calais are inside a sulphur emission control area, where fuel must not exceed 0.10% sulphur unless an exhaust gas cleaning system (scrubber) is fitted. Scrubber wash-water piping, the overboard discharge and the hull penetration around it are among the fastest-corroding parts of a modern ship, so they belong in the gauging scope at every docking and, on open-loop systems, between dockings.
Typical gauging jobs at Calais
Work at Calais is shaped by timetables. We agree a scope with the operator's technical office, identify which spaces and decks are released and when, and plan a team size to match. Readings are reported by deck or tank in the class format, so they can be used at the next survey or passed straight to the yard doing the refit. Where an operator has several ships on the Strait, jobs can be staged over successive visits so each ship stays on its rota.
- Vehicle deck and ramp gauging on a ro-pax ferry during an overnight layover, ahead of a planned refit.
- Ballast and fuel tank gauging on a ro-ro freight ship released by the operator for a longer stay.
- Scrubber wash-water and overboard piping gauging on a ferry that works entirely inside the SECA.
- Pump and discharge piping gauging on a dredger between campaigns on the Channel sandbanks.
- Pre-purchase condition gauging on an older ro-ro or general cargo ship laid up in the basins.
How a thickness measurement job runs at Calais
Most of the work on a Calais job happens before the team boards: scope, plan and access are settled first, so the time on board goes on measurement.
Paris Charles de Gaulle and Brussels are the usual long-haul arrival points, with rail or road onward to Calais; Lille Lesquin is a regional alternative. Technicians travel from India on Schengen visas applied for once the vessel's schedule is confirmed. Because Calais ships run on fixed timetables, the plan uses firm dates agreed with the operator, and passes to the ferry and freight terminals are requested through the ship's agent, who also confirms what time the spaces will be released.
- Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
- We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
- Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
- Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
- Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
- The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.
Who does the work, and when class approval applies
The inspection team is mobilised from India for each job; nobody is stationed at the port, so mobilisation is planned against the vessel's schedule and visa lead times. Our founder and Responsible NDT Level III, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has over eleven years of international field experience, plans and supervises the work. Technicians are certified under the company's written practice to ASNT SNT-TC-1A, and the company holds ISO 9001 and ISO 14001 certification.
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Governing codes and standards
- IACS UR Z7 hull classification surveys
- IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
- IACS UR Z17 approval of service suppliers
- SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
- MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
- The rules of the vessel's classification society
What you receive
- Thickness measurement report on the class formats, with sketches
- Summary of substantial and excessive corrosion against allowable margins
- Pitting and grooving records with depth and extent
- Piping wall-thickness tables with isometric sketches
- Magnetic particle or penetrant crack-detection reports
- Gauge calibration records and technician certificates
Industries served
- Ro-pax ferries
- Ro-ro freight ships
- Dredgers
- Tugs and pilot boats
- General cargo ships
- Steel and timber carriers
- Coasters
- Fishing vessels in the inner basins
Frequently asked questions
How much of a Calais ferry can be gauged without disrupting the timetable?
A useful amount, if the scope is focused. Vehicle decks, ramps, machinery piping and scrubber lines can be gauged during layovers and quiet periods, and tanks that the crew release can be measured too. A full programme belongs in a refit period, and the readings taken at Calais help the yard fix its steel scope in advance.
Do you gauge scrubber piping on ferries that run inside the SECA?
Yes. Ferries that run on the Dover Strait use their scrubbers on every crossing, so wash-water and overboard piping wears quickly. We gauge spools, bends and overboard connections accessible in the machinery space, report wall thickness against nominal, and flag pieces nearing renewal limits so replacements can be ordered before the next planned stop.
Is there a drydock at Calais for ships needing a docking?
Large ships usually go to a yard in another port for a docking, so we treat Calais as a place for pre-docking gauging. The readings help the superintendent decide which repairs to schedule and give the yard measured steel data to plan against. If the ship docks elsewhere in France or Belgium, one Schengen visa covers the trip.
Can dredgers working off Calais be gauged between campaigns?
Yes. Dredgers lie in the basins or alongside outer quays between jobs, and that is a good time to gauge pump, suction and discharge piping, hopper plating and hull structure. We agree the scope with the owner's superintendent and report the thinnest readings first so repairs can be targeted at what needs it most.
Does thickness measurement at Calais need class approval?
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Planning a survey or a drydock?
Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Request a QuoteRequest a ship gauging quote
Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Speak to an ASNT NDT Level III
Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.