Maritime inspection · France

Ultrasonic Thickness Measurement for Ships at Bastia

Bastia is Corsica's busiest passenger gateway and its ferry links reach Marseille, Toulon and Nice in France and Livorno, Genoa and Savona in Italy. Fuel tankers, cement carriers and general cargo coasters also call at the commercial harbour. With no big drydock on the island, the work is afloat gauging at the ferry berths and quays, and Atlantis NDT brings technicians from India to join the ship during its call.

Ferries to France and Italy

Ships that serve both the French mainland and the Tuscan and Ligurian coast pass through Bastia, so gauging results can feed dockings at yards in either country.

Harbour working around ferry timetables

Berth stays at the ferry terminal are short and rhythmic. We choose a short list of vehicle-deck, ramp and ballast-tank spaces and gauge them in the quiet hours of the call.

Fuel and cement coasters

Small tankers and bulk coasters discharging at Bastia give holds, hatch coamings and accessible tanks a chance to be gauged between discharge and sailing.

Inspection services for ships at Bastia

Each service has its own page with the method, the class requirements and what the report contains.

Ultrasonic Thickness Measurement (UTM)

Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.

Explore

Special Survey Thickness Measurement

Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.

Explore

CAS (Condition Assessment Scheme)

Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.

Explore

CAP Thickness Measurement

Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.

Explore

ESP Gauging

Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.

Explore

Hull Structural Integrity

Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.

Explore

Ship Piping Inspection

Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.

Explore

Scrubber Piping Inspection

EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.

Explore

IHM (Inventory of Hazardous Materials)

IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.

Explore

Marine NDT Services

Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.

Explore

Bastia's harbours and the ships that call

Bastia lies on the north-east coast of Corsica, facing the Tuscan archipelago across the Ligurian Sea. The old harbour, the Vieux-Port, is a small basin beneath the citadel used by yachts and small craft, while the commercial harbour stretches south of the town with ferry terminals, cargo quays and fuel berths. The harbour is protected by breakwaters, and its approaches from the east are open to swell, which affects berthing and anchoring on windy days. Most ships berth alongside rather than anchor.

Traffic here is unusually international for a small island port. Ro-pax ferries make overnight and day crossings to Livorno, Genoa, Savona and Piombino in Italy, and to Marseille, Toulon and Nice in France; some operate for French companies on the territorial continuity services and others for Italian lines. Fuel tankers supply the island's depots, cement and aggregate carriers serve the building trade, and general cargo coasters bring everything else. Cruise ships come between spring and autumn, some berthing and some anchoring, and fishing and work boats use the smaller basins.

The shape of the year is simple: crowded summer timetables and thinner winter ones. In July and August ferries run at full capacity with minimal turnaround, and releasing a compartment for inspection is hard. Between October and March schedules relax, and superintendents often use the lull to inspect a ferry before it moves to a mainland yard. Coasters keep a steadier rhythm tied to island demand. That means a gauging job at Bastia is planned as a few well-chosen spaces over a berth stay, with a second visit if the first one runs short, rather than a full-ship survey.

Where gauging fits at Bastia

Bastia has no drydock that takes ferries or sea-going cargo ships. Hull work, shell gauging out of water and sea chest inspection take place at mainland yards: ferries to and from Italy often use Ligurian or Tuscan yards, and French-flag ships tend to go to the Marseille or Toulon area. That makes the Bastia call valuable for the afloat scope. Ballast tanks, voids, vehicle decks and internal ramps, hatch and door structure, deck piping and scrubber lines can be gauged with the ship alongside and handed to the dock yard as a measured wastage list.

The ferry terminal berths offer the longest regular stay because the ship is stationary while vehicles load and unload. The commercial quays suit cargo ships and coasters, and the fuel berth suits small tankers whose deck and ballast spaces can be inspected during discharge. Cargo tank interiors need a gas-free certificate and are not normally released for a short fuel call. Access to each berth is arranged through the ship's agent, with each compartment gauged under the ship's own entry permit.

  • Ferry terminal berths — vehicle decks, ramps, stern and bow doors, ballast tanks and voids gauged during turnaround stays.
  • Commercial cargo quays — holds, hatch coamings and deck structure on coasters after discharge.
  • Fuel berth — deck, deck-piping and ballast-tank readings on small product tankers.
  • Cruise berth and roadstead — short-window gauging of piping and released tanks on cruise ships, depending on weather.
  • Lay-by berths — owner's condition checks and pre-purchase gauging on idle vessels.
  • Mainland docking yards — Bastia readings supply the steel estimate for dockings in France and Italy.

Thickness measurement through the survey cycle at Bastia

Class rules set the survey cycle, and the cycle sets how much gauging a ship needs. A superintendent planning a call at Bastia usually knows which survey is due; the table shows what the thickness measurement for each one typically involves. The exact extent comes from the class rules for the ship type and the surveyor attending, so the thickness measurement programme is agreed with the class before work starts.

SurveyWhen it fallsWhat the thickness measurement usually covers
Annual surveyEvery year, within three months of the anniversary dateGeneral examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey.
Intermediate surveyIn place of the second or third annual surveySuspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age.
Renewal survey No. 1Around 5 yearsThe first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal.
Renewal survey No. 2Around 10 yearsWider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey.
Renewal survey No. 3Around 15 yearsExtensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal.
Renewal survey No. 4 and laterAround 20 and 25 yearsGauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme.
Docking surveyTwice in each five-year periodBottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged.

Port state control and rules that apply to ships at Bastia

As a French port, Bastia comes under the Paris MoU port state control regime, with inspections carried out by the French ship safety centres. Ferries to and from Italy may be flagged in either country or elsewhere in the EU, and port state control applies to them on the same risk-based footing as any foreign ship. For an older ro-pax ferry, a record of wastage in vehicle decks, ramps and watertight doors helps both the superintendent and the inspector understand where concerns lie.

Shipping has been covered by the EU ETS since 2024 and FuelEU Maritime has applied since 2025, so owners of older Corsica ferries are weighing the economics of keeping them in service against emissions obligations. A thickness record helps decide whether a docking will include major steel renewal. The EU Ship Recycling Regulation requires an Inventory of Hazardous Materials for ships in EU ports, and updates often occur during the same docking. For ships that cross between France and Italy, the scope is set by class rules, whichever flag they fly.

Since 1 May 2025 the whole Mediterranean has been a sulphur emission control area, so ships calling at Bastia burn 0.10% sulphur fuel or run a scrubber. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service and are worth adding to the gauging scope at every docking.

Typical thickness gauging jobs at Bastia

A Bastia job normally begins with the ferry's docking specification and the date of the next class survey. We agree which spaces can be released during the berth stay, then gauge them in a sequence that avoids the loading and unloading peaks. Typical requests:

  • Vehicle-deck, ramp and ballast-tank gauging on a ro-pax ferry ahead of its winter docking at a mainland yard, reported deck by deck.
  • Hold and hatch-coaming gauging on a cement or aggregate carrier at the commercial quay during discharge.
  • Deck plating and deck piping readings on a small fuel tanker, with cargo tank work planned for a yard stay.
  • Pre-purchase condition gauging of a ferry or coaster lying at a lay-by berth, limited to spaces the owner can release.
  • Follow-up readings on a renewed vehicle deck or ramp after a mainland docking, to confirm the work against class limits.

How a thickness measurement job runs at Bastia

The sequence for a thickness measurement job at Bastia is short and written down, so the yard, the surveyor and the superintendent know who arranges what.

Bastia Poretta Airport serves the town, with flights from mainland France and other European cities. Technicians from India usually connect through a French or Italian hub. Port access for ferry terminals, cargo quays and the fuel berth is organised by the ship's agent, who also arranges a launch where needed. France is a Schengen state, so visas for the team are applied for in India after the ship's call or docking date is confirmed and the owner has supplied an invitation letter. Ferry timetables are published well in advance and that makes planning straightforward.

  • Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
  • We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
  • Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
  • Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
  • Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
  • The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.

Who does the work, and when class approval applies

We send the team from India to the ship for each job rather than keeping staff at the port, and plan the mobilisation around visas and the vessel's itinerary. The work is planned and supervised by the founder, our Responsible NDT Level III (ASNT NDT Level III in UT, RT, MT, PT and VT, with more than eleven years of international field experience). Technicians hold certification under the company's written practice to ASNT SNT-TC-1A; Atlantis is ISO 9001 and ISO 14001 certified.

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Governing codes and standards

  • IACS UR Z7 hull classification surveys
  • IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
  • IACS UR Z17 approval of service suppliers
  • SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
  • MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
  • The rules of the vessel's classification society

What you receive

  • Thickness measurement report on the class formats, with sketches
  • Summary of substantial and excessive corrosion against allowable margins
  • Pitting and grooving records with depth and extent
  • Piping wall-thickness tables with isometric sketches
  • Magnetic particle or penetrant crack-detection reports
  • Gauge calibration records and technician certificates

Industries served

  • Ro-pax ferries to France and Italy
  • Small product and fuel tankers
  • Cement and aggregate carriers
  • General cargo coasters
  • Cruise ships
  • Tugs and pilot boats
  • Fishing and workboats

Frequently asked questions

Can a ferry on the Italy route be gauged at Bastia?

Yes, in the spaces the crew can release during the berth stay. Vehicle decks, ramps and ballast tanks are the usual scope. We plan the order of work around loading and unloading, and where the stay is too short we agree a second visit on a later call or move the remaining scope to the docking.

Does Bastia have a drydock for ferries?

No. Ferries and sea-going cargo ships are docked on the mainland, in French or Italian yards. We do the afloat gauging at Bastia and supply a compartment-by-compartment report, which the docking yard and the superintendent can use to estimate the steel renewal before the ship reaches the dock.

How busy is Bastia in summer for an inspection?

Very busy, which limits what a crew can release. High-season ferries have short turnarounds and full decks. We keep the summer scope narrow, focusing on tanks and piping that do not interfere with loading, and recommend that thorough work be planned for the quieter winter months when ships can open more spaces.

Can holds on a cement carrier be gauged at the quay?

Yes, once the hold is discharged, ventilated and declared safe for entry. We gauge hatch coamings, tank-top plating, frames and lower bulkheads, taking readings against the ship's original scantlings and class tolerances. Residual cement dust can hide plating, so crews usually sweep the area before the gauging team starts.

Does thickness measurement at Bastia need class approval?

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Planning a survey or a drydock?

Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.

Request a Quote

Request a ship gauging quote

Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.








Speak to an ASNT NDT Level III

Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.