Construction Quality Assurance in Hyderabad
Construction QA and special inspection firms that perform NDT on structural steel, such as UT on complete-joint-penetration welds, MT on fillet welds and VT across the job, can use the Atlantis NDT ERP to manage that NDT work end to end. Projects capture job type, site, client PO, contract, methods, codes, scope and acceptance criteria, and tasks record component, method, technician, result and indication counts with WPS and procedure references.
NDT Reports covers UT, MT, PT, VT, RT and Hardness with weld and job lines recording defect type and orientation, and inspector, reviewer and approver signatures. Technician certifications, vision tests and exams are tracked with expiry warnings. Equipment calibration is tracked per serial number. Team Assignments dispatches inspectors to sites and blocks double-booking. Materials testing workflows such as concrete or soils testing are outside the standard product and are configured during implementation if needed.
Scope the implementation in Hyderabad
Use your own report templates, personnel records and equipment register to evaluate the proposed configuration. Confirm the contracting entity, hosting location, support hours, data access and any onsite work in the proposal. Location in this guide does not establish a local office, customer endorsement or pre-approved configuration.
Records and controls to evaluate
- Projects with codes, scope, acceptance criteria, safety induction and work permit fields
- Tasks with component, method, result, indication counts and WPS references
- UT, MT, PT, VT, RT and Hardness report types
- Weld and job lines with defect type and orientation
- Inspector, reviewer and approver signatures
- Technician certification and vision-test tracking with 90-day warnings
- Equipment calibration per serial number
- Team Assignments dispatch with double-booking prevention
Follow the work from start to finish
The project is opened with the specification, codes, acceptance criteria and safety induction and work permit details for the site. Inspectors are dispatched through Team Assignments with calibrated equipment, and the system blocks any inspector or instrument already committed to another project on the same dates. On site, they record weld results in the offline field app, including weld identification, defect type and orientation, photos and an on-screen signature, and sync when back in coverage.
Project tasks show which connections or members have been inspected and how many indications were found. Reports are reviewed and approved in the office and sent to the client and the engineer. Time is logged by work type, approved and invoiced against the client PO.
Check the evidence, permissions and handover
On structural steel jobs, the building official, engineer and contractor all want the same thing: a weld inspection record they can trust. Weld lines with defect type and orientation, WPS references, and signed review give them that, while certification and calibration records back up who did the work and with what.
During the trial, ask one user to create a record and another to review it. Make a correction, check which version a customer receives, and export the final record with its references. Record any manual steps or configuration gaps in the acceptance checklist.
Software organises evidence; it does not grant personnel certification, laboratory accreditation or customer approval. Confirm the requirements that apply to your work with the responsible technical or quality manager.
Questions about construction quality assurance
Does the ERP handle concrete or soils testing?
Not as standard. It is built for NDT work. Materials testing workflows are configured during implementation if they are part of the agreed scope.
Can we record weld defect type and orientation?
Yes. Weld and job lines on reports record defect type and orientation, with an overall result for the report.
Can inspectors work offline on site?
Yes. The offline field app stores reports and photos locally and syncs later.
Choose the next step
Request the 14-day ERP trial to work through a representative job. Use the integration scoping guide for external systems: a REST API connection needs an agreed data mapping, implementation and test plan.