SAE (ex-OAE) Compliance for Inspection Service Providers
NDT and inspection contractors working Ecuadorian oil and gas: the Oriente basin fields, the SOTE and OCP pipelines, the Esmeraldas and Shushufindi refineries and the fuel terminals, plus tank farms, power plants and metalwork fabrication. Personnel are qualified under employer-based certification, so a contracted Level III can sign the written practice and administer examinations for the firm.
It binds any firm that must present itself as an accredited inspection body, or be qualified by ARCH to inspect for an operator. The body named here is real but no longer carries that name. The Organismo de Acreditación Ecuatoriano (OAE), created under the Ley del Sistema Ecuatoriano de la Calidad, was renamed and now operates as the Servicio de Acreditación Ecuatoriano (SAE); older Ecuadorian legal text and legacy contracts still say OAE, which is a frequent source of confusion at tender stage. SAE accredits inspection bodies against NTE INEN-ISO/IEC 17020:2013, the Ecuadorian adoption. Applications run through SAE's SISAC and ACREDITA SAE platforms. Accreditation is granted for five years, maintained by two surveillance evaluations at eighteen-month intervals inside the cycle, with reaccreditation applied for before expiry. In the hydrocarbon sector operators additionally require ARCH qualification, so accreditation alone does not open the gate.
Source: SAE, "Cómo acreditarse: organismos de inspección" (accessed August 2026), giving the ISO/IEC 17020 basis, the SISAC application route, the three-part evaluation of documentary review, on-site verification and witnessing, the five-year accreditation period, two surveillance evaluations at eighteen-month intervals, reaccreditation before expiry, scope extension and withdrawal grounds; SAE news item on training in NTE INEN ISO/IEC 17020:2013 for accrediting inspection bodies, and SAE course for Andean Community technical experts on ISO/IEC 17020; SAE published scope document SAE-INS-17-002 and SAE-accredited inspection body scopes covering hydrocarbon-sector metallurgical and non-destructive inspection; Decreto Ejecutivo 1036 of 6 May 2020 creating ARCERNNR by merging the electricity, hydrocarbons and mining regulators, and Decreto Ejecutivo 256 of 8 May 2024 splitting it back into ARCH, ARCOM and ARCONEL under the Ministerio de Energía y Minas, with a 90-day implementation window, as reported by Primicias; SAE institutional pages confirming creation in 2007 under the Ley del Sistema Ecuatoriano de la Calidad and the OAE-to-SAE naming.
| Item | What applies | Why it matters |
|---|---|---|
| Authority | Servicio de Acreditación Ecuatoriano (SAE) as the national accreditation body; Agencia de Regulación y Control de Hidrocarburos (ARCH), re-established by Decreto Ejecutivo 256 of 8 May 2024 under the Ministerio de Energía y Minas, for hydrocarbon-sector qualification of inspection companies | The body that issues, audits and can withdraw |
| Applies to | NDT and inspection contractors working Ecuadorian oil and gas: the Oriente basin fields, the SOTE and OCP pipelines, the Esmeraldas and Shushufindi. | Whether this binds your firm at all |
| Personnel certification | Employer-based — the firm certifies its own, under a qualified Level III | Decides whether an outsourced Level III can sign for you |
| Renewal | SAE accreditation runs for five years and is maintained by two surveillance evaluations at eighteen-month intervals within the cycle; reaccreditation must be applied for before the cycle expires. Scope extension is available at any point on demonstration of conformity, and accreditation can be withdrawn where non-compliance affects technical competence or the quality of results. ARCH qualification runs on its own cycle set by the agency and must be tracked as a separate diary item; firms routinely lose work by keeping one current and letting the other lapse. | Diarise from the certificate date, not from memory |
| Methods in scope | UT, PAUT, RT, MT, PT, VT | Each method needs its own procedure and qualified personnel |
| Industries | Oil and gas production and transport, Refining, Fuel terminals and storage, Power generation, Mining | Where this regime shows up in contracts |
Who does SAE (ex-OAE) apply to?
NDT and inspection contractors working Ecuadorian oil and gas: the Oriente basin fields, the SOTE and OCP pipelines, the Esmeraldas and Shushufindi refineries and the fuel terminals, plus tank farms, power plants and metalwork fabrication. It binds any firm that must present itself as an accredited inspection body, or be qualified by ARCH to inspect for an operator.
Can an outsourced Level III sign for SAE (ex-OAE) compliance?
Yes. SAE (ex-OAE) accepts employer-based certification, which places the obligation on the employer and allows a contracted Level III to write and sign the written practice, approve procedures and administer examinations. The Level III must be qualified in each method they sign for, and the employer still owns the records.
What documents does a SAE (ex-OAE) audit ask for?
Solicitud de acreditación filed through SISAC with all annexes, plus payment of the file-opening fee, Management system documentation against NTE INEN-ISO/IEC 17020:2013, including the type A, B or C declaration and the impartiality analysis, Alcance de acreditación drafted in SAE's format, naming each inspection activity and the normative documents it is performed and judged against, Práctica escrita and personnel certification files by method and level, with authorisation records and ongoing competence monitoring evidence, NDT procedures approved by the Level III and traceable to the codes the client cites, typically ASME, API and AWS. Auditors open records before they open manuals, because a manual describes intent while records show practice. The most common failure is a documented system that does not match what the technicians actually do.
How often is SAE (ex-OAE) renewed?
SAE accreditation runs for five years and is maintained by two surveillance evaluations at eighteen-month intervals within the cycle; reaccreditation must be applied for before the cycle expires. Scope extension is available at any point on demonstration of conformity, and accreditation can be withdrawn where non-compliance affects technical competence or the quality of results. ARCH qualification runs on its own cycle set by the agency and must be tracked as a separate diary item; firms routinely lose work by keeping one current and letting the other lapse. Firms that diarise renewal from the certificate date rather than from the last audit avoid the lapse that forces a full reapplication.
What are the most common SAE (ex-OAE) findings?
Documents, contracts and certificates still cite "OAE", so the entity named does not match SAE's current register and the client's procurement system rejects it, The witnessing stage fails because the inspector observed on site is not the one whose competence file was submitted, Scope written in generic terms such as "ensayos no destructivos" rather than by activity and normative document, so SAE cannot grant it as drafted, Surveillance evaluation missed because the firm tracked the five-year expiry but not the eighteen-month surveillance points inside the cycle. These recur because they are records problems rather than capability problems — the work is being done correctly and the evidence is not being kept.
Which NDT methods does SAE (ex-OAE) cover?
UT, PAUT, RT, MT, PT, VT, ET, Thickness measurement. Each method in scope needs its own approved procedure and personnel qualified in that specific method; a Level III qualified in ultrasonics cannot sign for radiography.
Personnel certification under SAE (ex-OAE)
Employer-based certification is accepted and is the norm. Ecuador has no verified accredited domestic body certifying NDT personnel to ISO 9712, so technicians hold employer certification written against ASNT SNT-TC-1A, or ISO 9712 certificates issued abroad. An outsourced Level III can sign the written practice, approve NDT procedures and certify Level I and II staff. The constraint sits on the other side of the transaction: inside a SAE-accredited inspection body, personnel competence must be demonstrated to the assessor against NTE INEN-ISO/IEC 17020:2013, meaning training, formal authorisation, witnessed performance and ongoing monitoring records. An SNT-TC-1A card on its own is not sufficient evidence at a SAE witnessing evaluation.
The audit sequence
- Confirm eligibility: legal personality, a functioning quality management system, competent personnel, adequate infrastructure and demonstrated knowledge of SAE's requirements
- File the accreditation application through SISAC with annexes and pay the file-opening fee
- SAE appoints the evaluation team and issues the estimated cost of the service
- Evaluation in three parts: documentary review, on-site verification, and witnessing of the inspection body's own inspectors performing real inspections
- Close non-conformities within the timescales SAE sets
- SAE decision and grant of accreditation for a five-year cycle
- Two surveillance evaluations at eighteen-month intervals during the cycle, and reaccreditation applied for before the cycle expires
Documents an auditor asks for
- Solicitud de acreditación filed through SISAC with all annexes, plus payment of the file-opening fee
- Management system documentation against NTE INEN-ISO/IEC 17020:2013, including the type A, B or C declaration and the impartiality analysis
- Alcance de acreditación drafted in SAE's format, naming each inspection activity and the normative documents it is performed and judged against
- Práctica escrita and personnel certification files by method and level, with authorisation records and ongoing competence monitoring evidence
- NDT procedures approved by the Level III and traceable to the codes the client cites, typically ASME, API and AWS
- Equipment inventory with calibration and verification records for each method in scope
- ARCH qualification file for hydrocarbon-sector work, kept current independently of the SAE cycle
- Authorisation from the national radiation control authority for industrial radiography sources, operators and source transport
- Internal audit, management review, non-conformity and corrective-action records covering the full scope claimed
Findings firms get against SAE (ex-OAE)
- Documents, contracts and certificates still cite "OAE", so the entity named does not match SAE's current register and the client's procurement system rejects it
- The witnessing stage fails because the inspector observed on site is not the one whose competence file was submitted
- Scope written in generic terms such as "ensayos no destructivos" rather than by activity and normative document, so SAE cannot grant it as drafted
- Surveillance evaluation missed because the firm tracked the five-year expiry but not the eighteen-month surveillance points inside the cycle
- Personnel competence evidenced only by an SNT-TC-1A card, with no authorisation record, no witnessed performance and no ongoing monitoring as ISO/IEC 17020 requires
- ARCH qualification lapsed while SAE accreditation stayed live, and the contractor was rejected at the operator's gate
- Procedures approved by a Level III whose own certification in that method had already expired
- Impartiality analysis silent on group companies that also supply, fabricate or repair the items being inspected