Maritime inspection · Belgium
Ultrasonic Thickness Measurement for Bulk Carriers and Ships in Ghent
Ghent is reached only by the canal from Terneuzen, and the ships that make that passage come for steel, grain, forest products and cars. Bulk carriers discharging iron ore and coal at the steelworks are the core of the port's gauging work: hold frames, hopper plating and topside tanks take punishment on every call. Superintendents use us for UTM in Ghent before intermediate and renewal surveys, and every ship is attended by technicians mobilised from India.
Holds after ore and coal discharge
Bulk carriers at the steelworks quay leave with holds swept and empty. That short window is the best time for hold-frame, bracket and hopper gauging, before ballast is taken and the ship sails for its next cargo.
A canal port with predictable stays
The Terneuzen locks and the canal passage mean ships call for whole cargo operations rather than quick stops, and berth times are planned. Gauging can be scheduled against a known discharge or loading plan.
Ro-ro and agribulk alongside
Ro-ro ships loading cars and trailers, and handysize bulkers handling grain and oilseeds, offer deck, ramp, hold and hatch-coaming gauging on their regular calls at the Ghent docks.
Inspection services for ships at Ghent
Each service has its own page with the method, the class requirements and what the report contains.
Ultrasonic Thickness Measurement (UTM)
Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.
ExploreSpecial Survey Thickness Measurement
Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.
ExploreCAS (Condition Assessment Scheme)
Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.
ExploreCAP Thickness Measurement
Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.
ExploreESP Gauging
Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.
ExploreHull Structural Integrity
Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.
ExploreShip Piping Inspection
Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.
ExploreScrubber Piping Inspection
EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.
ExploreIHM (Inventory of Hazardous Materials)
IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.
ExploreMarine NDT Services
Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.
ExploreGhent: a canal port for steel, bulk and ro-ro
Ghent is the inland end of North Sea Port. Ships enter from the Westerschelde through the sea locks at Terneuzen and follow the Ghent–Terneuzen canal south across the Dutch–Belgian border to docks on the northern side of the city. The canal limits the size of ship that can call, so the bulk carriers seen here are smaller than the ore carriers that discharge at Rotterdam, and the fleet is made up of mid-sized bulk carriers, ro-ro ships, general cargo ships and product tankers. The cargo base is industrial: iron ore and coal for the ArcelorMittal steelworks, grain and oilseeds for processing plants, forest products, fertilisers, biofuels and vehicles. Inland barges share the canal, carrying cargo on into the Belgian and French waterway network.
The canal passage changes how ships use the port. Lock slots and canal pilotage make arrival and departure planned events, and a bulk carrier coming to Ghent normally stays for its whole discharge rather than lightening and moving on. Ro-ro services to Scandinavia run on regular rotations from the Ghent docks, and agribulk ships often wait between discharge and their next fixture. Those patterns give predictable windows: the time between end of discharge and sailing, a lay period alongside, or the hours a ro-ro ship spends between rotations.
Inspection demand therefore centres on bulk carriers. They are ESP ships under IACS UR Z10.2 (single-side skin) or Z10.5 (double-skin), and the ore and coal trade wears them in predictable places: hold frames and their brackets, lower stools and hopper plating, hatch coamings, and the topside and hopper ballast tanks. Coal cargoes add corrosion of hold steel where moisture and sulphur combine. Ships on this trade face intermediate surveys with close-up and thickness requirements, and a superintendent who gauges them at Ghent can plan steel well ahead of the yard.
Where gauging fits along the Ghent docks and canal
The steelworks quays on the canal are the most frequent setting for bulk carrier gauging in Ghent. Once the grabs have finished and the holds are swept, the ship provides lighting and access, and the team works through frames, brackets and hopper plating to the TM plan, adding the topside and hopper tanks where the crew can de-ballast and ventilate them before departure. Agribulk and forest-product terminals give similar windows on smaller bulk carriers and general cargo ships. Hull gauging in Ghent beyond the holds, such as deck plating and ballast tank structure, depends on what the crew can empty and ventilate during the call.
Ghent is not a dry-docking centre for deep-sea ships, so dockings are usually planned elsewhere — Vlissingen, Antwerp or further afield — and the Ghent call is used for pre-docking gauging that sizes the steel list. Readings taken here travel with the ship and are recorded in a form the docking yard can use directly. Ro-ro berths serving the Scandinavian services, and the car terminal, suit deck and ramp gauging during lay periods. Tankers loading or discharging biofuels and oil products at the canal-side tank terminals work under terminal permits, with tank entry only when the ship is gas-free.
- Steelworks ore and coal quays — hold frame, bracket, hopper and hatch coaming gauging on bulk carriers between end of discharge and sailing.
- Agribulk terminals — hold, tank-top and ballast tank readings on handysize and supramax bulkers after a grain or oilseed discharge.
- Forest products and general cargo berths — hatch cover, coaming and tween-deck gauging on multipurpose and open-hatch ships.
- Ro-ro and car terminal berths — main-deck, ramp and car-deck gauging on ro-ro ships during lay periods between rotations.
- Canal-side tank terminals — manifold and deck-line wall thickness on product and biofuel tankers, with cargo tanks left until a gas-free certificate is issued.
Thickness measurement through the survey cycle at Ghent
How much steel has to be gauged depends on which survey the ship is due for, its type and its age. The pattern below is the usual one under IACS unified requirements; the attending surveyor and the class rules for the ship decide the final extent. For a ship calling at Ghent, we agree the programme with the class and the owner before the team mobilises.
| Survey | When it falls | What the thickness measurement usually covers |
|---|---|---|
| Annual survey | Every year, within three months of the anniversary date | General examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey. |
| Intermediate survey | In place of the second or third annual survey | Suspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age. |
| Renewal survey No. 1 | Around 5 years | The first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal. |
| Renewal survey No. 2 | Around 10 years | Wider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey. |
| Renewal survey No. 3 | Around 15 years | Extensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal. |
| Renewal survey No. 4 and later | Around 20 and 25 years | Gauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme. |
| Docking survey | Twice in each five-year period | Bottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged. |
Steel trade, emissions rules and port state control in Ghent
Ghent's ships fall under Paris MoU port state control as callers at a Belgian port, and the canal and the Westerschelde approaches lie in the North Sea SOx ECA, and compliant 0.10% sulphur fuel or a scrubber is needed for the whole passage. Under the Paris MoU an older bulk carrier is a candidate for an expanded inspection, and hold damage from grabs and corrosion is easy for an inspector to see. Arriving with recent gauging and documented repairs puts the master in a better position if a port state control officer looks into the holds.
Decarbonisation plans for the steel and chemical industry along the canal, together with port and industry projects in hydrogen, carbon capture and biofuels, will change Ghent's cargo flows over time. Ore and coal carriers will keep calling meanwhile, and the owners of those older Panamax and supramax bulkers are weighing the carbon obligations that arrived with EU ETS for shipping in 2024 and with FuelEU Maritime a year later against the steel renewal due at the next renewal survey. Gauging supplies the steel side of that judgement, and a Ghent discharge, with empty holds and a planned berth time, is a sensible place to collect it.
Ships trading to Ghent are inside a sulphur emission control area, where fuel must not exceed 0.10% sulphur unless an exhaust gas cleaning system (scrubber) is fitted. Scrubber wash-water piping, the overboard discharge and the hull penetration around it are among the fastest-corroding parts of a modern ship, so they belong in the gauging scope at every docking and, on open-loop systems, between dockings.
Gauging scopes that suit a Ghent call
Because ships in Ghent stay for a full cargo operation, scopes can be larger than at a coastal terminal, but they still end when the ship sails. A good Ghent job is planned around the discharge or loading sequence, with the most important spaces measured first and the report ready before departure. Where a docking follows, the readings are prepared for the docking yard as well. Typical scopes include:
- A Panamax bulk carrier after discharging ore at the steelworks: hold frames, brackets and hopper plating in all holds, ahead of its second renewal survey.
- A supramax bulker after a coal cargo: hold-side and tank-top gauging in holds showing coal-related corrosion, plus topside tank readings if the tanks can be emptied.
- A ro-ro ship on a Scandinavian service: main-deck plating and ramp structure gauged during a lay period, with magnetic particle testing at the ramp hinges.
- A product tanker discharging biofuel at a canal-side terminal: deck piping, manifold and pump-room line wall-thickness checks under the terminal permit.
- A buyer's pre-purchase gauging of a handysize bulker at an agribulk berth: holds, hatch coamings and accessible ballast tanks measured before the sale closes.
How a thickness measurement job runs at Ghent
Most of the work on a Ghent job happens before the team boards: scope, plan and access are settled first, so the time on board goes on measurement.
Brussels Airport is the nearest large international gateway, and Ghent is reachable from it by road or by train; Amsterdam Schiphol is an alternative when Dutch-side work in Terneuzen is combined. Port terminals are ISPS-controlled, and the agent arranges gate passes for the berth and confirms the canal arrival time. A team travelling from India needs Schengen visas, which we start on once you confirm the ship's expected call; with lock and canal timings involved, we keep the mobilisation date linked to the agent's updates.
- Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
- We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
- Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
- Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
- Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
- The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.
Who does the work, and when class approval applies
The inspection team is mobilised from India for each job; nobody is stationed at the port, so mobilisation is planned against the vessel's schedule and visa lead times. Our founder and Responsible NDT Level III, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has over eleven years of international field experience, plans and supervises the work. Technicians are certified under the company's written practice to ASNT SNT-TC-1A, and the company holds ISO 9001 and ISO 14001 certification.
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Governing codes and standards
- IACS UR Z7 hull classification surveys
- IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
- IACS UR Z17 approval of service suppliers
- SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
- MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
- The rules of the vessel's classification society
What you receive
- Thickness measurement report on the class formats, with sketches
- Summary of substantial and excessive corrosion against allowable margins
- Pitting and grooving records with depth and extent
- Piping wall-thickness tables with isometric sketches
- Magnetic particle or penetrant crack-detection reports
- Gauge calibration records and technician certificates
Industries served
- Bulk carriers
- Ro-ro ships and vehicle carriers
- General cargo and multipurpose ships
- Product and biofuel tankers
- Forest-product and open-hatch carriers
- Short-sea cargo ships
Frequently asked questions
How much hold gauging can be done between discharge and sailing in Ghent?
That depends on the number of holds, the cleaning time and how long the ship stays after the grabs finish. We plan the sequence with the superintendent beforehand, most critical holds and frames first, and set the team size so the planned scope fits the window. Anything not reached is identified clearly in the report rather than left as a silent gap.
Do the Terneuzen locks affect scheduling?
Yes. Ships reach Ghent only through the Terneuzen locks and the canal, so arrival depends on lock slots and pilotage. Travel is booked against the agent's latest estimate, and we stay flexible as it moves. Once the ship is alongside in Ghent, the cargo plan rather than the lock decides the working window.
Can a Ghent gauging job prepare for a docking elsewhere?
Often it is the best use of the call. A steel estimate gathered in the holds and tanks at Ghent goes with the docking specification to whichever yard the owner chooses, so competing yards are compared on the same measured basis and steel can be ordered before the ship arrives.
Do you check hatch covers and coamings on bulk carriers?
Yes. Hatch coamings, coaming stays and hatch cover plating are gauged with the hold programme, and cracking at coaming brackets can be checked by magnetic particle testing. On ships in the ore and coal trade those areas see impact and corrosion, and their condition matters for weathertightness as well as for structural strength.
Does thickness measurement at Ghent need class approval?
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Planning a survey or a drydock?
Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Request a QuoteRequest a ship gauging quote
Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Speak to an ASNT NDT Level III
Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.