Asset Integrity Digital Twin for Nigeria

Atlantis Digital Twin puts measured inspection data, API 581 risk-based inspection scoring and API 579-1/ASME FFS-1 fitness-for-service on a single live 3D model of the asset, for operators and integrity contractors working in Nigeria.

The asset base this is built for

The Dangote refinery and petrochemical complex, NNPC and its joint ventures, Shell, TotalEnergies, Chevron and ExxonMobil offshore assets, Port Harcourt and Warri refining, and the FPSO fleet operating in the Gulf of Guinea.

The regulatory and code environment

NUPRC and NMDPRA regulate upstream and midstream/downstream operations respectively, with NCDMB local-content requirements shaping how contractors staff and register. Inspection follows ASME Section V, VIII and IX, API 510/570/653 and API 580/581, with ISO 9712 or ASNT personnel certification and, offshore, class-society requirements.

Why it matters here specifically

Offshore and FPSO work here carries very high mobilisation cost and constrained inspection access, so inspection planning quality has an outsized effect on total cost — and evidence provenance matters because operator audits are frequent and documentary.

What the twin does

Regional asset detail

Digital twin coverage across Nigeria

Lagos · Port Harcourt

Frequently asked questions

What does an asset integrity digital twin change for operators in Nigeria?

It moves the integrity case from a spreadsheet snapshot to a live model. Every UT, PAUT, TOFD, RT, MT, PT and ET reading binds to a corrosion monitoring location with a persistent identity, so corrosion rates come from a real time series rather than an assumed default. RBI under API 580/581 then ranks on measured condition, and API 579 fitness-for-service runs against the stored thickness grid. Offshore and FPSO work here carries very high mobilisation cost and constrained inspection access, so inspection planning quality has an outsized effect on total cost — and evidence provenance matters because operator audits are frequent and documentary.

Which codes and regulators does it have to satisfy in Nigeria?

NUPRC and NMDPRA regulate upstream and midstream/downstream operations respectively, with NCDMB local-content requirements shaping how contractors staff and register. Inspection follows ASME Section V, VIII and IX, API 510/570/653 and API 580/581, with ISO 9712 or ASNT personnel certification and, offshore, class-society requirements. Every record carries provenance — which procedure revision was in force, which inspector performed the work and what their certification state was at that moment, and whether the instrument was in calibration — which is the bundle a regulator, insurer or client audit actually asks for.

Do we need to laser-scan the plant first?

No. Geometry can come from LiDAR or photogrammetry capture, drone survey, or from existing BIM, CAD, isometrics and P&IDs. Many first deployments start from isometrics and add scan-derived geometry later, because reconciling the CML register — not capturing geometry — is the task that actually gates the timeline.

How long until the first unit is live?

Ten to fourteen weeks is typical: two to three weeks of geometry capture or import, three to four weeks reconciling the CML register and importing historical thickness data, two to three weeks assigning damage mechanisms per API RP 571, then RBI and FFS configuration and integrity-team training. Subsequent units are considerably faster once the data model and conventions are set.

Book a technical demo

Thirty minutes walked through your asset classes, your damage mechanisms and your integration stack, co-presented by an ASNT NDT Level III. Affordable, accessible, fully customizable — request a demo and a tailored quote.

Related: asset integrity management software · Atlantis Digital Twin platform · vendor comparison · ROI calculator · inspection management ERP in Nigeria.